31887_31887_Aperio_index.jpg

Aperio wireless security can be installed in under two minutes

  • 24 Oct 2014

  • Share

The company’s YouTube channel shows the system being installed in under two minutes

No cabling or wiring on Aperio systems means that no costly electrical work is required on site prior to a facility being fitted up with the security solution.

Aperio products are manufactured to suit a variety of door and security needs, with the range including locks, cylinders and escutcheons for wood, aluminium or glass doors.

Audit trail

Both exterior and interior doors, fire and safety doors with mandatory security requirements, as well as meeting rooms and offices are protected by Aperio’s audit trail, which helps to make building management work better in order to meet safety needs.

Aperio locks with integrated card readers can be added to a door in order to link it to the access control system and allow it to be used with existing cards or a single digital credential.

The ‘Time Challenge: Aperio Cylinder,’ video on YouTube demonstrates how quick it is to install Aperio technology, with a technician being shown to complete one installation in 1 minute and 58 seconds.

Customers can contact one of the 100 Aperio partners for a new wireless access control system, or alternatively ask an existing provider to upgrade doors with technology for heightened security measures.

Watch out for Part 3 of The Aperio Effect: Save Energy Save Money

Contact ASSA ABLOY EMEA:

ASSA ABLOY EMEA
Communications: Thomas Schulz
Phone: +49 (0) 30 81062970
Email: thomas.schulz@assaabloy.com

ASSA ABLOY EMEA
Dukes Court/ Dukes Street
Woking
Surrey GU21 5BH
United Kingdom

Visit ASSA ABLOY'S EMEA website

Leave a Reply

More articles

Dulux Trade

Multi million pound college development assisted by Dulux Trade

A Nottinghamshire college’s recent redevelopment has allowed for new buildings, facilities and opportunities, and Dulux Trade has been involved in the update.

Posted in Articles, Building Industry News, Building Products & Structures, Case Studies, Interior Design & Construction, Interiors, Paints, Coatings & Finishes, Posts, Restoration & Refurbishment, Retrofit & Renovation

  • Share
Kee Systems

Roof safety solution from Kee Systems simply quali-tea

A combination of Kee Systems’ safety products have been installed at the Twinings facility in Andover, to offer a top quality edge protection solution for staff members on the rooftop.

Posted in Articles, Building Industry News, Building Services, Health & Safety, Membranes, Plant, Equipment and Hire, Posts, Roof Edge Protection, Roofs, Site Preperation

  • Share
REHAU
Senior Architectural Systems

Senior's PURe® windows top of the class

Given it offers low U-values, Senior’s PURe® aluminium window system has allowed contractor B&K to make large cost savings on the construction of schools.

Posted in Aluminium Products, Articles, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Innovations & New Products, Posts, Retrofit & Renovation, Sustainability & Energy Efficiency, Windows

  • Share