33625_33625_image.jpg

26 August 2015

Clamp-on heat/energy metering solution offers cost savings

When servicing a building, it is important to measure the thermal heat/energy consumption of hot (LTHW) and chilled water services, in order to monitor, control and manage its energy consumption. However, the installation process – which includes system drain down and pipe cutting – often presents a costly barrier to wider application of sub-metering. U1000[…]

  • 26 August 2015

  • Share
32861_32861_Imge.jpg

19 August 2015

Ramp heating system allows for all year-round vehicle access

Expected to be completed later this year, the facility incorporates a steep ramp for refuse vehicles to use, enabling them to transfer waste to the incinerator. The ramp heating system has been specified and installed at the new facility Heat Mat’s high Wattage ramp heating cables were specified for installation under a 210mm concrete and[…]

  • 19 August 2015

  • Share
  • 28 January 2014