Screen Shot 2018-08-02 at 15.20.08

03 August 2018

Wilo provides hot solution for challenging heating project

Wilo was recently very pleased to contribute to the renovation of Brooke Farm near Oakham in Rutland, with 7 of its products incorporated into the project.

  • 03 August 2018

  • Share
Wilo
  • 31 July 2018

  • Share
Delta Membranes
  • 30 July 2018

  • Share
Kingspan
  • 30 July 2018

  • Share
Kingspan

25 July 2018

Kingspan Optim-R top of the class in Glasgow

In Glasgow, a Grade B listed primary school has seen three rooms refurbished to offer optimum thermal performance, courtesy of the Kingspan OPTIM-R Flooring System.

  • 25 July 2018

  • Share
GEZE

24 July 2018

Opening the Doors to a Shoppers’ Paradise with GEZE

GEZE UK is opening doors to shoppers at Glasgow Fort, which has launched a third phase of shops and leisure facilities at its out-of-town shopping and leisure complex.

  • 24 July 2018

  • Share
Wrightstyle
  • 24 July 2018

  • Share
Schueco
  • 23 July 2018

  • Share
Ancon

23 July 2018

Ancon launches improved IHR Head Restraint

ANCON has re-engineered its IHR internal head restraint to accommodate gaps at the wall head of up to 75mm, extending the previous maximum of 50mm.

  • 23 July 2018

  • Share
Keystone Lintels
  • 20 July 2018

  • Share