Buildingtalk newsletter registration

Tensar TriAx solution for the road to Euro 2012 football

Tensar Internationalcontact supplier

TriAx® design solution

Tensar International’s TriAx® design solution has been used in the construction of a 17.9 km bypass to improve traffic flow in Gdansk, Poland, including the route to the UEFA Euro 2012 football tournament.

Tensar TriAx® has been used in the sub-base construction to help combat differential settlement across the poor soil of the Wistula river delta and minimise frost heave caused by Poland’s severe winters.

The  Tensar TriAx® design solution mechanically stabilised the sub-base of the road and minimised any differential settlement. It is quick and easy to install, requires less aggregate than conventional road design and provides protection against any movement as a result of the sub-zero temperatures.

For more information, read the full story pdf above.

Add to my alerts

You need to be logged in to add alerts.

Sign in