DuPont Tyvek new structureguard img 1

Fforest Timber works with DuPont to apply membrane solution for new build

  • 28 Apr 2017

  • Share

Fforest Timber agreed to work with DuPont to apply the very latest membrane solution from the Tyvek system of advanced products for a new build project.

Developers WDL Homes Ltd were also chosen to become early adopters of the advanced StructureGuard solution.

DuPont Tyvek new StructureGuard img 3

The three storey, two block stand-alone development in Aberdare, Wales, has a 981 square metre block and a 255 square metre block. Together they form a configuration with a pitched slate roof and an elegant facade in painted block work and render, with feature stone elements.

There was an eight week interval between installing the membrane-wrapped timber elements and applying the external skin, so optimum performance was vital – both to protect the timber engineering and to allow various trades to continue work until completion.

DuPont Tyvek new StructureGuard img 2

DuPont Tyvek StructureGuard has vapour diffusion, strong yet lightweight durability, plus superior water hold out (above W1 at 1500mm) and robust wind washing resistance. Being fully BBA certified, this version has been adapted to be ideal for larger scale commercial projects in exposed situations.

It is suitable for either off-site application (as in this case) or when quick and easy on-site installation is essential.

DuPont Tyvek new structureGuard img 4

Tyvek StructureGuard is compatible with all specialised tapes and sealants, creating a cocoon around a structure to both shield its insulation and enhance thermal efficiency and comfort once occupied.

Susan Brewer of Fforest Timber who worked closely with DuPont technical teams during this first UK installation for Tyvek StructureGuard says “We are very familiar with the ease and reliability of Tyvek and have always experienced great service and results, so we were more than happy to go with this new product for our project in Aberdare.”

DuPont Protection Solutions
BBSP1
Bristol & Bath Science Park
Dirac Crescent
Emersons Green
Bristol
BS16 7FR

General enquiries: 01275 337667 (Option 2)
Technical: 01275 337667 (Option 1)

Visit DuPont Tyvek's website

Leave a Reply

More articles

Dulux Trade

Multi million pound college development assisted by Dulux Trade

A Nottinghamshire college’s recent redevelopment has allowed for new buildings, facilities and opportunities, and Dulux Trade has been involved in the update.

Posted in Articles, Building Industry News, Building Products & Structures, Case Studies, Interior Design & Construction, Interiors, Paints, Coatings & Finishes, Posts, Restoration & Refurbishment, Retrofit & Renovation

  • Share
Kee Systems

Roof safety solution from Kee Systems simply quali-tea

A combination of Kee Systems’ safety products have been installed at the Twinings facility in Andover, to offer a top quality edge protection solution for staff members on the rooftop.

Posted in Articles, Building Industry News, Building Services, Health & Safety, Membranes, Plant, Equipment and Hire, Posts, Roof Edge Protection, Roofs, Site Preperation

  • Share
REHAU
Senior Architectural Systems

Senior's PURe® windows top of the class

Given it offers low U-values, Senior’s PURe® aluminium window system has allowed contractor B&K to make large cost savings on the construction of schools.

Posted in Aluminium Products, Articles, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Innovations & New Products, Posts, Retrofit & Renovation, Sustainability & Energy Efficiency, Windows

  • Share