Paul Henson, sales and marketing director at Ramtech Electronics, looks at why having an EN54-compliant wireless fire alarm system provides the best way of minimising risks on a construction site…

Each year there are hundreds of fires on construction sites, potentially putting the lives of workers and members of the public at risk. Ensuring that workers and assets are protected therefore requires careful consideration of a number of factors.

WES+ med resSize of the project, proximity of nearby buildings, number of storeys and type and amount of flammable materials present, plus other factors, all need to be taken into account. Although the health and safety record of the construction industry has improved significantly over the last few years, the risk from fire remains high and ever present.

In fact, the dangers from fire are multiplied because it can spread rapidly to adjacent buildings putting members of the public at risk. Legislators are well aware of the dangers, and fire safety in the UK’s construction industry is covered by a number of laws, guidelines and codes of practice, including:

 

  •  The Regulatory Reform (Fire Safety) Order (2005)
  •  The Construction (Design and Management) Regulations
  •  HSE Fire Safety Guidelines for Construction Sites (HSG168)
  •  The Fire Protection Association Joint Code of Practice
  •  BS5839-1 – Fire detection and fire alarm systems for buildings.
  •  Code of practice for design, installation, commissioning and maintenance of systems in non-domestic premises
  •  The Structural Timber Association’s 16 Steps to Timber Frame Construction

All of these set out fire safety requirements in relation to their particular focus and each specifies that an appropriate fire alarm system must be used. These guidelines form a comprehensive set of best practice indicators for the use and installation of fire safety systems in the construction industry.

Alongside this legislation, the Construction Products Regulation, which came into force in 2013, says that fire alarm products sold in the European Union must be tested and independently certified against Harmonised European standards where these exist.

In the case of fire detection and fire alarm products, that standard is EN 54 Fire detection and fire alarm systems. Effectively, the law and best practice guidelines require that construction sites are protected with a suitable fire alarm system and EN 54 is the standard against which fire alarm systems should be measured.

More recently, the The Joint Code of Practice on the protection from Fire on Construction Sites and Buildings Undergoing Renovation (JCOP) has been updated (October 2015) and is now available in its 9th edition.

This latest version applies to activities carried out prior to and during the procurement, construction and design process. JCOP is an important document for construction professionals as it is commonly referred to in insurance contracts because it is recognised as best practice.

The objective of JCOP is to prevent fires on construction sites and it includes some useful guidance on how to do this. For instance, the most significant update to the 9th edition reinforces the need for construction site fire alarm systems to meet the requirements of EN 54.

Paragraph 13.8 lays this out: Components of automatic fire detection and alarm systems should be marked as complying with EN 54.

In updating JCOP, the FPA and the insurance industry has made it much easier to specify construction site fire alarms that are up to the same high standard as other safety critical construction site products such as ladders and scaffold boards.

JCOP caries considerable influence as it was developed by the Technical Division of the Fire Protection Association (FPA) and experts from the insurance industry who reported to the RISCAuthority Risk Control Steering Group.

Technological solution

The key to minimising damage and injury from fire is bringing all these pieces of legislation together into a comprehensive fire alarm system. There are two basic routes – either a wireless or wired system.

An EN 54 compliant wireless fire alarm system offers significant installation benefits because it requires no hard wiring – making it easy to install and reposition the units.

There is the added advantage that it provides site-wide protection because the wireless signal is capable of passing through all solid materials typically found on a building site.

Construction professionals are realising the benefits of installing a fully EN 54 compliant fire alarm system.

Fire can cause immense damage to assets that are costly to rectify, not to mention smoke and flames being an immediate danger to workers and people in nearby buildings. Fire safety in completed buildings is regarded with the utmost importance – regular fire drills and testing of equipment – and so it is common sense that it should also be treated in the same way for a building under construction.

The need to protect people from harm during this phase should be as much of a priority as it is for those that will ultimately live and work within the completed building.

Read more in the December issue of PSB Magazine

Leave a Reply

Latest news

Mitsubishi Electric

Mitsubishi Electric set to host CIBSE Journal webinar

Mitsubishi Electric will host a CIBSE Journal webinar on Wednesday 24th April 2024 at 1pm to discuss the legislation and initiatives driving changes in the way we will need to heat, cool and ventilate large commercial buildings to reach net zero emissions in the UK.

Posted in Air Conditioning, Articles, Building Industry Events, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Facility Management & Building Services, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Information Technology, Pipes & Fittings, Plumbing, Seminars, Sustainability & Energy Efficiency, Training

Hamworthy

Hamworthy: What to consider when choosing a heat pump?

At the heart of an efficient heat pump system lies an important element: the refrigerant – Jason Allen, Commercial Product Manager, Groupe Atlantic UK, ROI & NA. Hamworthy Heating is a Groupe Atlantic brand.

Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Facility Management & Building Services, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Pipes & Fittings, Plumbing, Retrofit & Renovation, Sustainability & Energy Efficiency

Kingspan

EJOT Colorfast chosen for Kingspan’s highly sustainable new Asian factory

More than 120,000 EJOT Colorfast self-drilling fasteners have helped Kingspan to create a thermally superior, visually-appealing building envelope for its first purpose-built manufacturing plant in South East Asia.

Posted in Articles, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Posts, Restoration & Refurbishment, Retrofit & Renovation, Roofs, Sustainability & Energy Efficiency

ASSA ABLOY

ASSA ABLOY helps new manufacturing plant achieve LEED Gold certification

Improving sustainability performance is becoming a higher priority for building developers, owners and users. One consequence is fast-growing demand for green building certifications — and therefore specification. Specialist input can make the difference between hitting and missing a project target, as ASSA ABLOY explains here…

Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, BIM, Infrastructure & CAD Software, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Case Studies, Doors, Facility Management & Building Services, Information Technology, Retrofit & Renovation, Security and Fire Protection, Sustainability & Energy Efficiency