Product category:
Pipes
News Release from: Durapipe UK | Subject: Range of pipe and fittings
Edited by the Buildingtalk Editorial
Team on 22 March 2006
Durapipe perfect fit for city centre
development
Range of pipe and fittings from Durapipe UK has been specified for the new Bellway City Gate apartment complex in Castlefield, Manchester.
A range of pipe and fittings from Durapipe UK has been specified for the new Bellway City Gate apartment complex in Castlefield, Manchester Wefatherm pipework has been installed in sizes ranging from 25mm - 125mm, complete with valves and fittings, to meet the needs of the boosted cold water supply, which is distributed from the basement to the building's 115 apartments
This article was originally published on Buildingtalk on 1 Jun 2005 at 8.00am (UK)
Related stories
Sheffield City Hall hosts Durapipe UK
An extensive range of pipe and fittings from Durapipe UK has been installed at Sheffield City Hall, as part of a large-scale refurbishment project.
Durapipe UK helps to manufacture car care products
Range of pipe and fittings from Durapipe UK has been used within an expansion of Autoglym Limited's manufacturing factory in Letchworth, Hertfordshire.
Sub-contractors, Thermotech, were originally tasked with specifying a copper pipework system, but after Durapipe UK recommending the benefits of Wefatherm, the specification was changed.
Wefatherm was specified as a more cost effective solution than alternative products, with the benefits of fast and efficient installation, through its superior socket fusion jointing method, resulting in reduced labour time and costs.
John Toboni, of Thermotech, said: "Wefatherm is a great space-saving pipework product, which is ideal for a development such as the City Gate apartments".
"The system is reliable and its simple installation technique allowed labour time and costs to be reduced".
Wefatherm boasts excellent performance properties, including low heat conducting capacities, thermal aging resistance and high resistance to corrosion and deposit build up, which all contribute to increasing the product lifespan, providing significant life cycle cost savings.
The 14-month development of City Gate apartments is due for completion in April 2006.
• Durapipe UK: contact details and other news
• Email this article to a colleague
• Register for the free Buildingtalk email newsletter
• Buildingtalk Home Page

