Visit the Renderplas web site
Click on the advert above to visit the company web site

Product category: Structural Fixings and Fasteners
News Release from: Halfen | Subject: HK4 brickwork support system
Edited by the Buildingtalk Editorial Team on 02 June 2003

Halfen products supporting role at
Paddington

Halfen's HK4 brickwork support system used at London's prestigious new Paddington Basin commercial development.

The problem of supporting brickwork across a cavity that varies from 50mm to 125mm has been successfully solved by Halfen's HK4 brickwork support system at London's prestigious new Paddington Basin commercial development Designed by Executive Architects Broadway Malyan, building A, the first of three buildings at West End Quay combines cladding panels with feature brickwork at high level on the front elevation and on first-to-seventh floors at the rear, as well as on the west gable

Working closely with the architects and Bansal Builders, the brickwork contractors, Halfen supplied HK4 brickwork support brackets in grade 304 stainless steel tailored to the requirements of the building's details.

The brackets were secured into Halfen 38/17 HTA channel that had been cast into the face of the floor slabs.

In place of the traditional expanded polystyrene filler, the channel was supplied with Combi, a reinforced polyethylene filler that can be pulled from the channel in one continuous strip.

This enabled brickwork to proceed more quickly and for the filler to be disposed of more economically. Request a free brochure from Halfen ...

Halfen: contact details and other news
Email this article to a colleague
Register for the free Buildingtalk email newsletter
Buildingtalk Home Page

Search the Pro-Talk network of sites

Visit the Renderplas web site