Transdek completes double deck lift installations
Transdek is helping Boots and Tesco develop their double deck supply chains by installing double deck lifts at both DC and store level.
One of the key benefits of Transdek lifts are their modular design, which allows for speedy installation of under 1.5 days, and easy relocation.
Transdek is now being asked to deliver on the promise of easy relocation and to move lifts between sites, once leases expire, as well as move them between bays on the same site, allowing for increased flexibility in warehouse reorganisation.
To date Transdek has relocated more than 25 lifts within clients distribution networks.
Most recently, Transdek was able to remove a lift, including the entire loadhouse 'pod' from a Bristol RDC in 4 hours, and re-install the equipment the following day at a Coatbridge DC, some 360 miles away in Scotland.
Transdek will be demonstrating one of its 6.5 tonne double deck lifts - developed specifically for use at store level - at both Logistics Live in June, and IMHX in November.
Not what you're looking for? Search the site.
Browse by category
- Building Industry News (7919)
- Information Technology (2961)
- Building Structures and Products (15785)
- Building Services (11320)
- Building Systems (1482)
- Security and Fire Protection (2472)
- Site Preparation (1588)
- Landscaping (563)
- Plant, Equipment and Hire (1776)
- Civil Engineering (1465)
- Interiors (1258)
- Latest Exhibitions and Awards (24)

