Visit the MatrikonOPC web site
Click on the advert above to visit the company web site

Product category: Construction companies
News Release from: Ischebeck Titan | Subject: Speedpost
Edited by the Buildingtalk Editorial Team on 23 February 2007

New system speeds edge protection

Request your FREE weekly copy of the Buildingtalk email newsletter. News about Construction companies and more every issue. Click here for details.

New post and panel system, branded Speedpost, promises to speed the installation of edge protection in floor to soffit situations

A new post and panel system promises to speed the installation of edge protection in floor to soffit situations, saving contractors time and minimising delays in creating a safe working environment The system, branded Speedpost, is claimed to be ten times faster to install than typical edge protection systems, enabling twenty metres of edge protection to be installed in less than ten minutes, a level of performance made possible by the fact that Speedpost does not require any drilling or casting of sockets, or fixing of brackets to provide support for posts or panels

Fully compliant with the requirements of BS EN 13374:2004 for Class A edge protection, Speedpost's success lies in a cleverly-designed post that extends between the cast concrete floor and soffit to support the system's mesh panels which provide the edge protection.

Once positioned and extended to ceiling height, the post is tensioned quickly and easily using an integral handle, which can be locked for security.

The process is then completed by panels being secured in position by means of an integral latch.

The system's ease and speed in use means that it can be repositioned with the minimum of effort and provides versatility in application, enabling it to be used in areas other than solely edge protection, such as the cordoning of interior work areas.

The new system, Speedpost, is available exclusively in the UK and Ireland from leading formwork and falsework manufacturer, Ischebeck Titan and promises not only to save contractors time and money, but also to make a major contribution to site safety by simplifying the provision of effective edge protection.

Ischebeck Titan: contact details and other news
Email this article to a colleague
Register for the free Buildingtalk email newsletter
Buildingtalk Home Page

Search the Pro-Talk network of sites

Visit the MatrikonOPC web site