Product category:
Construction companies
News Release from: ISG InteriorExterior | Subject: Imperial College project
Edited by the Buildingtalk Editorial
Team on 24 January 2007
ISG InteriorExterior win Imperial
College project
ISG InteriorExterior has been awarded a GBP1.6 million project by Imperial College London to upgrade facilities at the Department of Earth Science and Engineering.
ISG InteriorExterior has been awarded a GBP1.6 million project by Imperial College London to upgrade facilities at the Department of Earth Science and Engineering The highly regarded department, which is part of the Faculty of Engineering, will benefit from enhanced IT capabilities, with the construction of six new computer suites, along with two new teaching laboratories
This article was originally published on Buildingtalk on 31 Oct 2006 at 8.00am (UK)
Related stories
Constructing worlds largest Audi Centre
ISG InteriorExterior has secured a GBP30 million shell and core contract to build the world's largest Audi Centre for Audi UK.
Second corporate fit out scheme at More London
ISG InteriorExterior has been awarded a project from More London Developments to fit out office space at 3 More London Riverside and 4 More London Riverside.
The project sees ISG InteriorExterior strip out existing office accommodation within the department to form six new computer suites, which will feature moveable partition walls to enhance flexibility.
In addition to the installation of new mechanical and electrical services, suspended ceilings and floor finishes, ISG InteriorExterior will also build a range of bespoke display cabinets, which will be used to display the department's geological samples.
The project also involves the construction of two new Waste Management Laboratories within an existing storage area.
The contractor will construct a structural steel mezzanine floor above the new teaching laboratories to house the specialist mechanical and electrical services required, and the new laboratories will be equipped to a high standard.
The fast track project is scheduled for completion by May 2007.
Steve Trotter, Managing Director of ISG InteriorExterior commented: "As an organisation we have built an enviable reputation for the successful delivery of a full range and scale of education projects, from refurbishment and upgrade schemes to keynote projects such as our GBP24 million Business Academy at Bexley.".
• ISG InteriorExterior: contact details and other news
• Email this article to a colleague
• Register for the free Buildingtalk email newsletter
• Buildingtalk Home Page

