Visit the Wernick Buildings web site
Click on the advert above to visit the company web site

Product category: Timber Buildings and Timber Products
News Release from: Kingspan Off-Site | Subject: Multibeam purlins and Multichannel rails
Edited by the Buildingtalk Editorial Team on 12 January 2007

Kingspan in the frame for Coventry
'digs'

Request your FREE weekly copy of the Buildingtalk email newsletter. News about Timber Buildings and Timber Products and more every issue. Click here for details.

Best solution at major regeneration in Coventry was a complete steel frame incorporating Multibeam purlins and Multichannel rails and joists from Kingspan Structural Products.

A major regeneration and refurbishment of 'The Pillar Box' in Coventry has now been completed, creating accommodation for over 100 students within strolling distance of Coventry University Steelwork was undertaken by Ballard Engineering of Staffordshire and incorporated a two-storey roof extension on each of two wings, using Kingspan Multibeam purlins and Multichannel side rails and floor joists

Initial plans specified a partial timber frame for the extension; however, this would have added to the installation time and necessitated unsightly and awkward internal columns.

The best solution was a complete steel frame incorporating Multibeam purlins and Multichannel rails and joists from Kingspan Structural Products.

Multichannel is complemented by the Kingspan Multibeam purlin and rail system, which is designed to suit buildings with pitched, mansard, flat or curved roof construction.

With a high strength to weight ratio, Multibeam offers the most efficient range of sections to suit the widely varying conditions and loadings required in modern roof construction.

With an autumn completion deadline that simply couldn't be missed, speed of delivery and erection were very important factors and Kingspan played a significant role: throughout the project thousands of metres of products were manufactured and delivered to site within just a couple of weeks of the orders being placed.

Kingspan Off-Site: contact details and other news
Email this article to a colleague
Register for the free Buildingtalk email newsletter
Buildingtalk Home Page

Search the Pro-Talk network of sites

Visit the Wernick Buildings web site