Product category:
Timber Buildings and Timber Products
News Release from: Kingspan Off-Site | Subject: Kingspan Frame Sections
Edited by the Buildingtalk Editorial
Team on 20 August 2007
Kingspan frame-up at Manchester skyline
central
One of the most luxurious new medium-rise developments in Manchester has benefited from the specification of Kingspan Frame Sections to help speed up construction, completion and handover.
Skyline Central, an 18-storey residential development in a highly convenient city centre location, incorporates stunning leisure facilities that include a 20 metre swimming pool on the top floor, gym, sauna, steam room and winter garden Timely handover of the building was crucial so the developers could capitalise on investment return - but without compromising quality
This article was originally published on Buildingtalk on 27 Feb 2007 at 8.00am (UK)
Related stories
Kingspan Frame Sections save construction time
New medium-rise developments in Manchester benefit from specification of Kingspan Frame Sections to help speed up construction, completion and handover.
Kingspan Frame Sections are top of the class
Frame Sections from Kingspan Off-Site have been integral to the timely completion of the new York College building.
Facade installer ECL Contracts specified Kingspan Frame Sections.
As ECL Construction Manager Daniel Sillis explained: "We specified Kingspan Frame Sections for several reasons, not least competitive pricing and rapid turnaround".
"But the way in which product deliveries were batched and marked in line with our installation requirements was also a deciding factor".
Prior to delivery Kingspan bundles, straps together and product marks sections in the order specified by the installer.
This results in significant on-site time savings as sections arrive on time, and in the right sequence to allow immediate installation.
The technique helps installers to maximise the benefits of 'stud and track' building, an elemental on-site framing method of construction which is faster than conventional wet trades.
Recent analysis by consultants Cyril Sweett indicates that stud and track is twice as quick to install as blockwork.
Kingspan Frame Sections can also accommodate an almost unlimited choice of exterior and interior facings and linings.
In the case of Skyline Central the prestige image was enhanced by a high pressure laminate (HPL) timber-effect finish and complementary tinted glazed units.
• Kingspan Off-Site: contact details and other news
• Email this article to a colleague
• Register for the free Buildingtalk email newsletter
• Buildingtalk Home Page

