Product category:
Industrial, Portable and Prefabricated Buildings
News Release from: Konstructa Hire | Subject: Triple stacked accomodation
Edited by the Buildingtalk Editorial
Team on 08 July 2008
Konstructa hire stacks its success three
fold
When Bell Projects required high-quality site accommodation that could be triple stacked, it appointed Konstructa Hire to supply the necessary facilities.
As on-site space was minimal, Bell Projects was looking for accommodation which would make effective use of the area available Provision of facilities for workers as well as suitable office, kitchen and toilet amenities were required
This article was originally published on Buildingtalk on 11 Jul 2008 at 8.00am (UK)
Related stories
Konstructa site accommodation for Rialto Homes
Konstructa site accommodation hire buildings are purposefully designed to endure the conditions and the general environment of the building-site.
Costly delivery delays for site accommodation
Delays with the delivery of quality site accommodation costs GBP50 million to the construction industry each year, says site accommodation hire company Konstructa Hire.
Other modular building providers that Bell Projects had approached, were unable to triple stack buildings.
Konstructa Hire was the only company able to provide the right solution, at the right price.
John Lindsey, Senior Site Manager at Bell Projects says: "Having researched site-accommodation providers, only Konstructa could triple stack the buildings.
We were absolutely delighted with the all-steel construction of cabins and they are much wider and longer than other cabins.
It is the best site accommodation I have ever had." With a fleet of brand new, market-leading anti-vandal products, manufactured in-house, Konstructa Hire commits to deliver stock cabins to a customer's site within 48 hours of the order being placed.
After Bell Projects made the initial call to Konstructa Hire, a representative visited its site the very next day.
Work soon began to prepare the ground level for the installation of the 12 units in two, triple-stacked, linked complexes.
The units were loaded onto level concrete pads from the road by tower crane and were up and running within three days.
Bell Projects was building four luxury houses in Hampstead Heath, London, so it was essential that the quality of site accommodation reflected the excellence of the build.
Konstructa Hire accommodation can be tailored to suit customer needs, including features such as corporate livery.
The product range includes site offices, mess rooms, drying rooms, toilet units, as well as secure and container storage.
John continues: "The delivery of the buildings was very smooth.
We were really impressed with what was achieved within a short time frame.
Konstructa Hire also supplied all the furniture, so we were up and running very quickly.
"The accommodation has exceeded all our expectations and we are just as delighted with the professional customer service." To find out how Konstructa Hire can provide the construction products and services you need for your project call 0845 355 3444 or visit the website.
• Konstructa Hire: contact details and other news
• Email this article to a colleague
• Register for the free Buildingtalk email newsletter
• Buildingtalk Home Page

