Product category:
Roofing
News Release from: Lakesmere | Subject: Building envelope specialists
Edited by the Buildingtalk Editorial
Team on 03 August 2007
Lakesmere takes centre stage at the 02
Arena
National building envelope specialists Lakesmere has put in another winning performance following the successfully completion of cladding works at the new 02 Arena.
Following the company's appointment to complete cladding works on the new arena, which is the centrepiece of a multi-million pound scheme to regenerate the Millennium Dome and surrounding areas, main contractor Sir Robert McAlpine conducted a Key Performance Report on Lakesmere Looking at the five core services areas including design, quality, health and safety and supervision, Lakesmere was awarded a consistently high rating of 'very good', with average scores between 71% and 90%
This article was originally published on Buildingtalk on 9 Apr 2007 at 8.00am (UK)
Related stories
Lakesmere picture of health with new contract wins
National building envelope specialists Lakesmere has been awarded contracts on two of UK's most prestigious new hospital developments.
Lakesmere on a winner with new contracts
National building envelope specialists Lakesmere has announced new contract wins totalling GBP11.6million.
The company's highest score was for its design expertise, which at 95% was rated as 'excellent' by the project team at Sir Robert McAlpine.
The challenging project saw Lakesmere install the 'back of bowl' cladding using the innovation new Kalzip XT system.
The XT sheets were installed horizontally and, along with standard Kalzip sheets and steel substructure, were designed to create a complex yet visually impressive graduating 'corkscrew twist' effect where the pitch of the sheets changed by 22 over a length of approximately 45 metres.
Located within the existing fabric structure of the Millennium Dome, Lakesmere's work area was extremely restricted and so effective communication with main contractor Sir Robert McAlpine and other members of the project team was vital to it success.
The new 02 Arena is only the second UK project to feature the new Kalzip XT system following the recent completion of the new grandstand development at Aintree Racecourse, where Lakesmere was also the specialist contractor.
• Lakesmere: contact details and other news
• Email this article to a colleague
• Register for the free Buildingtalk email newsletter
• Buildingtalk Home Page

