Plasform post-formed doors for University
Leaderflush Shapland's Plasform Range were the perfect solution for the University of Strathclyde's new biomedical building.
When specifying materials for the construction of sensitive areas in industrial environments such as pharmaceutical areas, laboratories, clean rooms, food processing units and high tech industries, the need for doorsets that contribute to a contamination-free environment has never been greater.
Plasform post-formed doors for University of Strathclyde new biomedical building.
That's why performance doorsets from Leaderflush Shapland's Plasform Range were the perfect solution.
The University of Strathclyde has recently been recognised for its high teaching standards by achieving second place out of 100 entrants in the Guardian University poll for Pharmacy and Pharmacology.
By harnessing its knowledge in these fields the University has created the Strachclyde Institute of Pharmacy and Biomedical Sciences (SIPBS) and invested in building a new biomedical building.
237 Leaderflush Shapland doorsets were specified for the SIPBS new biomedical building, including Plasform Unique doorsets from the Plasform range of post-formed doorsets.
Specified to incorporate Leaderflush Shapland's Hygieniform Mist high impact PVC facing material, the Flushglaze flush glazing system and to provide up to 60 minutes fire resistance, the Plasform Unique doorsets were the natural choice for such an environment where hygiene, durability and performance are of extreme importance.
Flushglaze provides a completely flush joint with rebated acrylic outer glazing panels and combined with Hygieniform high impact PVC, helps to create a low maintenance, easy to clean durable finish.
Hygieniform is Leaderflush Shapland's exclusive high impact PVC facing options, available in a range of 16 colours, which contains the Hygienilac antimicrobial additive through its full thickness, killing harmful bacteria such as C.diff, MRSA, Salmonella and E.coli and does not support the growth of bacteria.
In environments where contamination is of paramount importance, the need to install fully integrated and certified doorsets, where the frame and door leaf are designed and manufactured to operate as a single unit, is vital.
Not what you're looking for? Search the site.
Related Stories
- GEZE UK glass entrances for Scottish Museum
- Sheerframe windows for homes in East Yorkshire
- TEK specified by Croudace for regeneration project
- Innovative solution to restrictive city project
- Unique steel framing solution for National Gallery
Browse by category
- Building Industry News (7919)
- Information Technology (2961)
- Building Structures and Products (15785)
- Walls (603)
- Floors and Flooring (1678)
- Ceilings (401)
- Roofs and Chimneys (1821)
- Lifts, Stairlifts and Escalators (377)
- Balconies, Balustrades, Stairs and Loft Ladders (170)
- Window Systems (1535)
- Curtain Walling, Facades, Louvres and Solar Shading (783)
- Insulation (969)
- Cladding (152)
- Rainwater Harvesting, Greywater Recycling, Green Roofs (147)
- Builders Merchants, Construction Materials, Workwear (1016)
- Architectural Ironmongery (505)
- Paints, Coatings and Finishes (748)
- Bricks, Blocks, Lintels and Joists (862)
- Canopies and Entrances (50)
- Rooflights and Roof Windows (105)
- Doors, Gates, Shutters, Air Curtains and Screens (666)
- Drainage, Guttering, Soffits and Fascias (403)
- Movable and Folding walls, Screens and Partitions (191)
- Fixings, Fasteners, Guardrails and Handrails (331)
- Damp Proofing, Waterproofing, Sealants and Adhesives (858)
- Windows - uPVC (644)
- Windows - Aluminium and Steel (150)
- Windows - Timber (141)
- Glass (430)
- Building Services (11320)
- Building Systems (1482)
- Security and Fire Protection (2472)
- Site Preparation (1588)
- Landscaping (563)
- Plant, Equipment and Hire (1776)
- Civil Engineering (1465)
- Interiors (1258)
- Latest Exhibitions and Awards (24)


