Pick Everard protects Scottish coast from erosion
Pick Everard has designed a protective construction for a Scottish airport exposed to continued erosion from the sea.
Benbecula Airport required assistance to combat the continual loss of coastline.
Pick Everard completed Phase One in 2003, saving a 500-metre stretch of coastline at the end of the runway and protecting the approach lighting.
Continued erosion meant further work was needed.
Phase Two involved the installation of 400 m of wire gabions, filled with 10,500 tonnes of stone, including an overlap with the original work.
That construction work has blended into the coast.
Not what you're looking for? Search the site.
Browse by category
- Building Industry News (7919)
- Information Technology (2961)
- Building Structures and Products (15785)
- Building Services (11320)
- Electrical Services (1682)
- Plumbing Services and Commercial Water Controls (443)
- Lighting Services (845)
- Heating Systems, Controls and Management (2387)
- Gas Services (198)
- Ventilation Services (528)
- Air Conditioning and Refrigeration Services (259)
- Self Build (43)
- Waste Services and Water Storage (143)
- Drainage Services (433)
- Construction Companies and Consultants (1445)
- Restoration, Refurbishment and Shopfitting (335)
- Facility Management and Building Services (361)
- Housing, Regeneration and Developments (321)
- Acoustics, Noise and Vibration Control (354)
- Architectural Services (376)
- Design and Build Services (487)
- Solar Energy Services (190)
- Building Automation and Control (244)
- Underfloor Heating (132)
- Utilities (26)
- Mechanical and Electrical (M&E) Services (42)
- Swimming Pools (24)
- Building Systems (1482)
- Security and Fire Protection (2472)
- Site Preparation (1588)
- Landscaping (563)
- Plant, Equipment and Hire (1776)
- Civil Engineering (1465)
- Interiors (1258)
- Latest Exhibitions and Awards (24)


