Product category:
Ceilings
News Release from: SAS International | Subject: Ventilation solutions
Edited by the Buildingtalk Editorial
Team on 26 April 2007
Sound approval with SAS Architectural
Metalwork
Working with SAS International, Hamiltons Architects introduced some innovative and natural ventilation solutions for the project.
Completed last year, Priory House, Shefford, Bedfordshire is the striking new purpose-built 6,000m facility for the Mid-Bedfordshire District Council Working with SAS International, Hamiltons Architects introduced some innovative and natural ventilation solutions for the project, which incorporated SAS International's acoustic vertical baffles and wall panels in this environmentally progressive building
This article was originally published on Buildingtalk on 8 Sep 2005 at 8.00am (UK)
Related stories
Anti-bacterial solution provides extra protection
SAS International anti-bacterial coating for metal ceilings and architectural products is suitable for a variety of public and commercial buildings.
SAS International metal ceilings
SAS International metal ceilings specified for the new Evelina Children's Hospital
Acoustic ceiling-mounted baffles were chosen for the main office areas.
They provide acoustic absorption in the office, to the client's required performance levels; while keeping the concrete soffit fully exposed for energy-efficient natural cross ventilation cooling.
Hamiltons Architects developed the baffle details alongside SAS International.
Further reading
SAS metal ceilings and wall cladding
SAS metal ceilings and wall cladding specified for the new Edinburgh air traffic control tower
New 'fine textured' metal ceiling finish from SAS
SAS International has introduced a new fine textured paint finish, SAS FT, for its range of metal ceiling panels and tiles.
MINI black metal ceilings from SAS International
Stunning black reflective metal ceilings from SAS International have already been used within a number of BMW MINI showrooms showrooms
Design constraints included; the depth and width of the baffles (which directly affected the performance of the soffit-mounted luminaires), the amount of air flow between baffles and localised acoustic requirements.
The baffles needed to be as narrow as possible, without compromising their performance or structural stability.
Manufactured in one wrap-around section with no exposed fixings, the final baffle solution also accommodated the variation in height expected from tolerances and deflection of the slabs, giving performance and aesthetic consistency throughout the office areas.
Project Architect at Hamiltons Architects, Jorge Ortega commented: "The baffles were an ideal solution because this is a naturally ventilated building which relies on cross ventilation at high levels to cool down the exposed concrete soffit, which in turn provides the thermal mass for this particular strategy to work".
"Baffles also provide vertical surfaces which are easy to clean, permitting extremely low maintenance at a very competitive cost." The building's double height Council Chambers were a further challenge.
They had been designed to be flexible: suitable for concerts, functions and exhibitions as well as their designated function.
Acoustic wall panels were proposed by Hamiltons Architects to comply with the acoustic requirements of the Chambers, and sixteen full-height acoustic wall panels were specified to absorb any reverberated sound.
The benchmark was to provide a vertical acoustic device for the same cost as a standard suspended ceiling system.
A solution based on SAS standard ceiling components, but placed vertically as opposed to horizontally, was developed with tiles fitted into a special frame to hold them together to meet this requirement.
SAS International's System 150 ceiling tiles were specified for use along the corridors of the building, connecting the cores.
The clip-in hinge-down system was specified for reasons of aesthetics, accessibility and robustness as the corridors contain the main service routes; total flexibility without compromising the building aesthetics was a key consideration, and this was achieved in this modern and minimalist design.
This exciting new building has regenerated a brownfield site, formerly occupied by the MOD at Chicksands allowing the Council to centralise its facilities in a modern and sensitive space, providing creative solutions for limited budget.
• SAS International: contact details and other news
• Email this article to a colleague
• Register for the free Buildingtalk email newsletter
• Buildingtalk Home Page

