<?xml version="1.0" encoding="iso-8859-1"?>
<rss version="2.0">
  <channel>
    <title>RSS News Feed for Smith Group - from Buildingtalk</title>
    <link>http://www.buildingtalk.com/news/tht/tht000.html</link>
    <description>Smith Group news releases on Buildingtalk</description>
    <language>en-gb</language>
    <copyright>Copyright (C)2008 Pro-Talk Ltd. All rights reserved.</copyright>
    <pubDate>Fri, 21 Nov 2008 08:00:00 UT</pubDate>
    <lastBuildDate>Fri, 21 Nov 2008 08:00:00 UT</lastBuildDate>
    <image>
      <title>Pro-Talk Ltd</title>
      <url>http://www.pro-talk.com/images/protalklogo90.gif</url>
      <link>http://www.pro-talk.com/</link>
      <width>90</width>
      <height>79</height>
    </image>
    <item>
      <title>Smith Group: Premier Travel Inn Partnership</title>
      <description>The Smith Group have assisted the hotel chain by implementing a long-term support system that, over time, will produce significant cost savings.</description>
      <pubDate>Thu, 30 Mar 2006 08:00:00 UT</pubDate>
      <category>Smith Group</category>
      <link>http://www.buildingtalk.com/news/tht/tht106.html</link>
    </item>
    <item>
      <title>Smith Group UK: five co-operative divisions</title>
      <description>Smith Group for electrical and mechanical contracting, CCTV and security systems, fire control systems, planned and reactive maintenance, and network and communication installations.</description>
      <pubDate>Mon, 27 Mar 2006 08:00:00 UT</pubDate>
      <category>Smith Group</category>
      <link>http://www.buildingtalk.com/news/tht/tht104.html</link>
    </item>
    <item>
      <title>Smith group provide complete MandE package</title>
      <description>Synergy of the Group's divisions allows the Company to amalgamate its sills and experience to provide a complete MandE package.</description>
      <pubDate>Tue, 21 Mar 2006 08:00:00 UT</pubDate>
      <category>Smith Group</category>
      <link>http://www.buildingtalk.com/news/tht/tht103.html</link>
    </item>
    <item>
      <title>Putting the value back into services engineering</title>
      <description>The Smith Group is a multi-faceted mechanical and electrical engineering company. Each contract, regardless of size, is personally handled with the utmost in dedication and care.</description>
      <pubDate>Fri, 17 Mar 2006 08:00:00 UT</pubDate>
      <category>Smith Group</category>
      <link>http://www.buildingtalk.com/news/tht/tht102.html</link>
    </item>
    <item>
      <title>Smith Group invests in people</title>
      <description>The Smith Group UK recently achieved registration to the Investors in People Standard.</description>
      <pubDate>Fri, 10 Mar 2006 08:00:00 UT</pubDate>
      <category>Smith Group</category>
      <link>http://www.buildingtalk.com/news/tht/tht100.html</link>
    </item>
    <item>
      <title>Smith group Kensington Academy Case Study</title>
      <description>Project included a fire alarm inclusive of 4 tone class change system, hearing enhancement, structure cabling, irrigation, and vent systems, under floor heating to the sports and drama halls.</description>
      <pubDate>Mon, 24 Oct 2005 08:00:00 UT</pubDate>
      <category>Smith Group</category>
      <link>http://www.buildingtalk.com/news/tht/tht101.html</link>
    </item>
    <item>
      <title>Smith Group: Ormskirk School Case Study</title>
      <description>The Smith Group was invited in at the initial stages of development to propose and later design and install the full range of engineering services</description>
      <pubDate>Fri, 16 Jul 2004 08:00:00 UT</pubDate>
      <category>Smith Group</category>
      <link>http://www.buildingtalk.com/news/tht/tht110.html</link>
    </item>
    <item>
      <title>Smith Group: Tiverton Hospital Case Study</title>
      <description>10 month project encompassed design and build of a full electrical installation to all areas of the hospital</description>
      <pubDate>Tue, 30 Mar 2004 08:00:00 UT</pubDate>
      <category>Smith Group</category>
      <link>http://www.buildingtalk.com/news/tht/tht109.html</link>
    </item>
    <item>
      <title>Smith Group case study: David Lloyd Leisure</title>
      <description>Smith Group offered included full electrical installation, fire alarm, emergency lighting, assistance alarm system, data and communication system, audio-visual equipment and car park lighting.</description>
      <pubDate>Fri, 15 Aug 2003 08:00:00 UT</pubDate>
      <category>Smith Group</category>
      <link>http://www.buildingtalk.com/news/tht/tht108.html</link>
    </item>
    <item>
      <title>Smith Group case study: Lava/Ignite, Burnley</title>
      <description>Smith Electrical completed a full electrical fit out to the Lava, over 25's club.</description>
      <pubDate>Tue, 03 Jun 2003 08:00:00 UT</pubDate>
      <category>Smith Group</category>
      <link>http://www.buildingtalk.com/news/tht/tht107.html</link>
    </item>
    <item>
      <title>Smith Group: Wychwood Park Case Study</title>
      <description>The Smith Group implemented all electrical circuitry and lighting, heating, air conditioning, plumbing, data systems, CCTV and security at the PGA European-tour standard golf course, Wychwood Park.</description>
      <pubDate>Tue, 18 Mar 2003 08:00:00 UT</pubDate>
      <category>Smith Group</category>
      <link>http://www.buildingtalk.com/news/tht/tht105.html</link>
    </item>
  </channel>
</rss>
