Smith Group: Tiverton Hospital Case Study
10 month project encompassed design and build of a full electrical installation to all areas of the hospital
Client: NHS.
Architect: Chapman and Taylor.
Value: £1,300,000.
Project Description: Tiverton Hospital is located in Devon.
This 10 month project encompassed design and build of a full electrical installation to all areas of the hospital including operating theatres, the patient care centre, EMI, maternity, rehabilitation community, mental health, x-ray, acute and day care wards.
Cannon Fire, part of the Smith Group, undertook the fire alarm installation for the hospital.
Project Features: The hospital is a modern design incorporating a hexagonal building with out wings.
The building is based on two floors, with a third administration area located within a glass atrium.
Not what you're looking for? Search the site.
Categories
- Building Industry News (5,249)
- Information Technology (2,159)
- Building Structures and Products (8,886)
- Building Services (6,779)
- Building Systems (755)
- Security and Fire Protection (1,753)
- Site Preparation (1,226)
- Landscaping (351)
- Plant, Equipment and Hire (1,182)
- Civil Engineering (1,007)
- Interiors (735)
