<?xml version="1.0" encoding="iso-8859-1"?>
<rss version="2.0">
  <channel>
    <title>RSS News Feed for UBS - from Buildingtalk</title>
    <link>http://www.buildingtalk.com/news/unv/unv000.html</link>
    <description>UBS news releases on Buildingtalk</description>
    <language>en-gb</language>
    <copyright>Copyright (C)2008 Pro-Talk Ltd. All rights reserved.</copyright>
    <pubDate>Fri, 21 Nov 2008 08:00:00 UT</pubDate>
    <lastBuildDate>Fri, 21 Nov 2008 08:00:00 UT</lastBuildDate>
    <image>
      <title>Pro-Talk Ltd</title>
      <url>http://www.pro-talk.com/images/protalklogo90.gif</url>
      <link>http://www.pro-talk.com/</link>
      <width>90</width>
      <height>79</height>
    </image>
    <item>
      <title>Mammoth hoist cuts costs at Strata Tower</title>
      <description>High rise construction specialists UBS installed two 90m/min high speed hoists and a 4.2 x 3 metre 'Mammoth' hoist using their innovative common tower at the South London development site.</description>
      <pubDate>Wed, 15 Oct 2008 08:00:00 UT</pubDate>
      <category>UBS</category>
      <link>http://www.buildingtalk.com/news/unv/unv111.html</link>
    </item>
    <item>
      <title>Achieve great heights with UBS access solutions</title>
      <description>UBS offers the experience to provide effective and innovative hoist and access solutions.</description>
      <pubDate>Thu, 13 Sep 2007 08:00:00 UT</pubDate>
      <category>UBS</category>
      <link>http://www.buildingtalk.com/news/unv/unv102.html</link>
    </item>
    <item>
      <title>Complete service for high rise hoists and access</title>
      <description>UBS provides a complete service for the specification, supply and installation of a range of high capacity personnel and material hoists for all forms of construction where access is required.</description>
      <pubDate>Thu, 13 Sep 2007 08:00:00 UT</pubDate>
      <category>UBS</category>
      <link>http://www.buildingtalk.com/news/unv/unv103.html</link>
    </item>
    <item>
      <title>Common Tower Hoist System from UBS</title>
      <description>UBS patented Aluminium Hoist Common Tower system allow comprehensive hoisting facilities to be installed on new build and renovation projects with minimum interference to the construction programme.</description>
      <pubDate>Thu, 13 Sep 2007 08:00:00 UT</pubDate>
      <category>UBS</category>
      <link>http://www.buildingtalk.com/news/unv/unv104.html</link>
    </item>
    <item>
      <title>UBS Case Study: Swiss Re Tower, 30 St Mary Axe</title>
      <description>One large Mammoth material hoist and three smaller high speed passenger/material hoists were sited externally on a common tower; the latter travel at 90 metres per minute.</description>
      <pubDate>Thu, 13 Sep 2007 08:00:00 UT</pubDate>
      <category>UBS</category>
      <link>http://www.buildingtalk.com/news/unv/unv105.html</link>
    </item>
    <item>
      <title>UBS Case Study: Canary Wharf High Rise Buildings</title>
      <description>UBS have provided expert hoisting advice, hoisting solutions and equipment on all of the high rise buildings on the Canary Wharf Estate.</description>
      <pubDate>Thu, 13 Sep 2007 08:00:00 UT</pubDate>
      <category>UBS</category>
      <link>http://www.buildingtalk.com/news/unv/unv106.html</link>
    </item>
    <item>
      <title>UBS Case Study: Beetham Tower, Manchester</title>
      <description>In the construction of this landmark building, UBS provided four high speed passenger and materials hoists were used, arranged around a Common Tower.</description>
      <pubDate>Thu, 13 Sep 2007 08:00:00 UT</pubDate>
      <category>UBS</category>
      <link>http://www.buildingtalk.com/news/unv/unv107.html</link>
    </item>
    <item>
      <title>UBS Case Study: Ontario Tower, London</title>
      <description>Low profile, high speed hoist system developed UBS was commissioned for the construction of the new 115 metre, 29 storey Ontario Tower at New Providence Wharf in London's East End.</description>
      <pubDate>Thu, 13 Sep 2007 08:00:00 UT</pubDate>
      <category>UBS</category>
      <link>http://www.buildingtalk.com/news/unv/unv108.html</link>
    </item>
    <item>
      <title>UBS Case Study: Broadgate Tower, London</title>
      <description>On the Broadgate Tower the hoisting consisted of three high speed passenger/material hoists arranged around a common tower and a specialist large high speed material hoist.</description>
      <pubDate>Thu, 13 Sep 2007 08:00:00 UT</pubDate>
      <category>UBS</category>
      <link>http://www.buildingtalk.com/news/unv/unv109.html</link>
    </item>
    <item>
      <title>UBS Case Study: Pan Peninsula Towers, London</title>
      <description>Common towers were designed to allow the minimum amount of cladding left off the building during the construction phase and to allow access to the floors as the building sets back at the upper levels.</description>
      <pubDate>Thu, 13 Sep 2007 08:00:00 UT</pubDate>
      <category>UBS</category>
      <link>http://www.buildingtalk.com/news/unv/unv110.html</link>
    </item>
    <item>
      <title>UBS and tallest riverside residential construction</title>
      <description>Hoist system developed by Universal Building Supply (UBS) has been commissioned for the construction of the new Ontario Tower at New Providence Wharf in London's East End.</description>
      <pubDate>Wed, 07 Jun 2006 08:00:00 UT</pubDate>
      <category>UBS</category>
      <link>http://www.buildingtalk.com/news/unv/unv101.html</link>
    </item>
    <item>
      <title>UBS low profile hoist tower streamlines Tower</title>
      <description>Low profile, high speed hoist system is enabling Carillion to dramatically improve efficiency and speed of elevating materials and personnel at  Beetham Tower, Manchester</description>
      <pubDate>Thu, 08 Sep 2005 08:00:00 UT</pubDate>
      <category>UBS</category>
      <link>http://www.buildingtalk.com/news/unv/unv100.html</link>
    </item>
  </channel>
</rss>
