Product category:
Industrial, Portable and Prefabricated Buildings
News Release from: Wernick Buildings | Subject: Modular buildings
Edited by the Buildingtalk Editorial
Team on 13 February 2007
Sparkies go for modular buildings from
Wernick
Manchester based Carey Electrical Engineering's new headquarters was built by Wernick just one metre from their old building.
The need for extra office space prompted one of the most respected electrical engineering companies in the North West to contact Wernick Buildings after MD, Richard Wild, spotted an article on modular building in a trade magazine Manchester based Carey Electrical Engineering's new headquarters was built by Wernick just one metre from their old building
This allowed the company's staff to make a smooth transition to their new premises when the 14 week project was completed.
The old building was then demolished.
The glazed lobby to the 725 square metre building is a bespoke design for Carey's.
Together with an open plan staircase to the first floor, the lobby features special lighting effects that are clearly visible from the outside of the building.
Integral roller shutters over all the double glazed widows were another feature specified by Mr Wild. Request a free brochure from Wernick Buildings ...
• Wernick Buildings: contact details and other news
• Email this article to a colleague
• Register for the free Buildingtalk email newsletter
• Buildingtalk Home Page


