32283_32283_iko111.jpg

Rapid response for IKO mastic asphalt hot charge tankers & luggers

  • 28 May 2015

  • Share

IKO’s new 24h lugger rapid response vehicle

How the IKO rapid response lugger service works

Once a tanker containing mastic asphalt and luggers have been delivered to site, the luggers are then available separately for contractors to hire from IKO for their roofing, car park or highways projects.

As many jobs are scheduled overnight, the IKO rapid response vehicle is on call 24/7 and will respond within 24 hours, and usually within 12.

  • Dedicated vehicle is manned by a qualified IKO fitter
  • Equipped for every eventuality, carrying tools, PPE, maintenance kit and spare parts

Marcus Lee, Sales Director of IKO: “IKO has 16 branded luggers available to hire nationally. They’re designed to save contractors time and money during the installation of our Permapark, Permaphalt, and Permatrack systems. Call-outs are very rare but the rescue and maintenance vehicle – also unique and now fully kitted out – is an integral part of this service. It acts as insurance that any problems with the tanker or lugger will be swiftly rectified. No other asphalt supplier has the resources to offer customers this level of support.”

For more information on IKO’s hot charge lugger service call 01257 255771

IKO PLC (Head Office), 
Appley Lane North,

Appley Bridge,
Wigan,
WN6 9AB,
United Kingdom

Phone: 01257 255 771
Fax: 01257 252 514
Email: sales.uk@iko.com
Twitter: @ikoplc

 

Visit IKO's website

Leave a Reply

More articles

FLIR

Added value thermal imaging with FLIR

IKO’s new 24h lugger rapid response vehicle How the IKO rapid response lugger service works Once a tanker containing mastic asphalt and luggers have been delivered to site, the luggers are then available separately for contractors to hire from IKO for their roofing, car park or highways projects. As many jobs are scheduled overnight, the[…]

Posted in Articles, Building Industry News, Information Technology, Innovations & New Products, Posts, Thermal Imaging and Monitors

  • Share
GAI

Request for door hardware experts’ input into the future of CE marking

The status of CE marking on construction products in Europe is to be considered as part of a review of the Construction Products Regulation (CPR), where the GAI will produce a response.

Posted in Architectural Ironmongery, Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Doors, Plant, Equipment and Hire, Posts, Publications, Research & Materials Testing, Windows

  • Share
Senior Architectural Systems

Senior fenestration systems welcome students into Stirling

Senior Architectural Systems have helped in the creation of the new landmark INTO Centre for International students at the University of Stirling.

Posted in Aluminium Products, Articles, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Curtain Walling, Posts, Retrofit & Renovation, Walls, Windows

  • Share
Knauf AMF

New Heradesign Creative from Knauf AMF - designed to inspire

Heradesign Creative is an innovative range of decorative and functional acoustic wall absorbers from Knauf AMF – available in eight shapes, they can be combined to produce truly unique designs.

Posted in Articles, Building Industry News, Innovations & New Products, Interiors, Posts, Walls

  • Share