Thermally efficient baralled roof fitted at garden centre ruined by fire

  • 16 Dec 2013

A total of 2,500m2 Protan SE 1.2mm was laid over the metal deck, vapour control layer and insulation board to enable a quick refurbishment ready for internal fit out.

The company’s prefabricated system uses Protan single ply membrane, designed to withstand harsh weather conditions and last for up to 30 years.

Protan UK,
256 Europa Boulevard,
Gemini Business Park,
Warrington,
WA5 7TN

Visit Protan UK's website

Leave a Reply

Latest news

MCRMA

First MCRMA members’ roadshow takes place at Siderise

Members of the MCRMA, the trade association for the metal cladding and roofing industry, had an exclusive opportunity to explore and discuss the changes affecting the construction sector at the first of the association’s roadshow events hosted by Siderise at its HQ and manufacturing facility in South Wales.

Posted in Articles, Building Associations & Institutes, Building Industry Events, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Cladding, Exhibitions and Conferences, Health & Safety, Restoration & Refurbishment, Retrofit & Renovation, Seminars, Walls

BMBI
Hambleside Danelaw

Hambleside Danelaw: Innovation to Installation - MidVerg20®

Hambleside Danelaw’s MidVerg20® interlocking verge system was manufactured to suit all flat intermediate gauge single-lap interlocking tile types, and can be installed on both new builds and refurbishments.

Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Innovations & New Products, Posts, Restoration & Refurbishment, Retrofit & Renovation, Roofs

KDG