Washroom Washroom M4 building

Washroom Washroom installs new bathrooms for M4 building

  • 12 May 2017

  • Share

Washroom Washroom has installed new male and female washrooms as part of the refurbishment of an office in Slough.

The seven storey building at Heathrow Approach, which occupies a strategic position adjacent to the M4, was built 15 years ago and until 2015 was occupied exclusively by Honda.

The building has now been remodelled by construction services company, ISG. A new landscaped approach, redesigned brickwork fin element, atrium and entranceway were all part of the refurbishment. Heathrow Approach now provides Grade A office accommodation and meets modern accessibility standards.

Washroom Washroom installed new male and female washrooms on four levels of the building in both the East and West cores, as part of the multi-million pound project. A new staff shower and changing area was also created by Washroom in the basement.

Washroom’s full height, flush front Alto toilet cubicles were specified with a dark walnut straight grain real wood veneer finish. The cubicle’s rebated edge design provides an attractive virtually seamless facade, while it offers complete privacy for users with its floor-to-ceiling doors.

Washroom’s Concerto integrated duct panel system, which was installed behind the toilets and urinals, was finished in the same real wood veneer to create a smooth finish. The system is designed to be easy-to-clean and allow ease of access for future repairs or maintenance, making it a popular choice for office washrooms.

The crisp white Zodiac stone vanities are comprised of 93 per cent quartz and catch and reflect light.

The staff shower and changing area in the basement features the same white Zodiac stone vanities along with Washroom’s bespoke locker system, also finished in white.

Trevor Bowers, director at Washroom Washroom said: “By using high quality wood veneer for the toilet cubicles in the washrooms, we’ve helped create a sense of cohesion between different areas of the building, which is something that clients are increasingly keen to see.”

Contact:

Washroom Washroom Ltd.
Units 1-10 Hill Farm
Epping Lane
Abridge
Essex RM4 1TU

Phone: 0800 999 8888

Email: info@washroom.co.uk

Visit the Washroom Washroom website

Leave a Reply

More articles

Encon

High ranking Encon’s fast track to success

Washroom Washroom has installed new male and female washrooms as part of the refurbishment of an office in Slough. The seven storey building at Heathrow Approach, which occupies a strategic position adjacent to the M4, was built 15 years ago and until 2015 was occupied exclusively by Honda. The building has now been remodelled by[…]

Posted in Articles, Building Industry Events, Building Industry News, Building Products & Structures, news, Posts

  • Share
Kingspan

Kingspan access floors launches new finishes

Kingspan – the world’s largest manufacturer, supplier, and installer of raised access floor solutions – is launching a new range of architectural floor finishes at London Build 2018.

Posted in Articles, Building Industry Events, Building Industry News, Building Products & Structures, Exhibitions and Conferences, Floors, Innovations & New Products, Posts, Timber Buildings and Timber Products

  • Share
Vetrotech

Vetrotech Saint-Gobain Environmental Product Declaration helps specifiers

Continuing its drive to become a key partner in sustainable construction schemes, Vetrotech Saint-Gobain has issued an Environmental Product Declaration (EPD) for its Contraflam 30 range.

Posted in Articles, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Glass, Posts, Sustainability & Energy Efficiency

  • Share
FLIR

Added value thermal imaging with FLIR

Washroom Washroom has installed new male and female washrooms as part of the refurbishment of an office in Slough. The seven storey building at Heathrow Approach, which occupies a strategic position adjacent to the M4, was built 15 years ago and until 2015 was occupied exclusively by Honda. The building has now been remodelled by[…]

Posted in Articles, Building Industry News, Information Technology, Innovations & New Products, Posts, Thermal Imaging and Monitors

  • Share