Washroom Washroom M4 building

Washroom Washroom installs new bathrooms for M4 building

  • 12 May 2017

  • Share

Washroom Washroom has installed new male and female washrooms as part of the refurbishment of an office in Slough.

The seven storey building at Heathrow Approach, which occupies a strategic position adjacent to the M4, was built 15 years ago and until 2015 was occupied exclusively by Honda.

The building has now been remodelled by construction services company, ISG. A new landscaped approach, redesigned brickwork fin element, atrium and entranceway were all part of the refurbishment. Heathrow Approach now provides Grade A office accommodation and meets modern accessibility standards.

Washroom Washroom installed new male and female washrooms on four levels of the building in both the East and West cores, as part of the multi-million pound project. A new staff shower and changing area was also created by Washroom in the basement.

Washroom’s full height, flush front Alto toilet cubicles were specified with a dark walnut straight grain real wood veneer finish. The cubicle’s rebated edge design provides an attractive virtually seamless facade, while it offers complete privacy for users with its floor-to-ceiling doors.

Washroom’s Concerto integrated duct panel system, which was installed behind the toilets and urinals, was finished in the same real wood veneer to create a smooth finish. The system is designed to be easy-to-clean and allow ease of access for future repairs or maintenance, making it a popular choice for office washrooms.

The crisp white Zodiac stone vanities are comprised of 93 per cent quartz and catch and reflect light.

The staff shower and changing area in the basement features the same white Zodiac stone vanities along with Washroom’s bespoke locker system, also finished in white.

Trevor Bowers, director at Washroom Washroom said: “By using high quality wood veneer for the toilet cubicles in the washrooms, we’ve helped create a sense of cohesion between different areas of the building, which is something that clients are increasingly keen to see.”

Contact:

Washroom Washroom
The Loughton Seedbed Centre
Loughton Langston Road Essex
IG10 3TQ

Visit the Washroom Washroom website

Leave a Reply

More articles

EverEdge

Give your lawn an edge with EverEdge

Steel edging from EverEdge assures freedom to create winding curves simply, bringing depth to any garden.

Posted in Articles, Building Industry News, Garden, Landscaping, Posts, Restoration & Refurbishment, Retrofit & Renovation

  • Share
REHAU

Retirement rooms revel in REHAU

REHAU’s grey laminated TOTAL70 windows and doors have been installed in an Essex retirement complex, ensuring both a practical and stylish finish.

Posted in Articles, Building Industry News, Building Products & Structures, Case Studies, Doors, Posts, Restoration & Refurbishment, Retrofit & Renovation, Windows

  • Share
GLASSOLUTIONS

Dundee waterfront benefits from Glassolutions innovation

GLASSOLUTIONS has secured a major contract to design and install curtain walling for the construction of the new V&A Museum of Design Dundee.

Posted in Articles, Building Industry News, Case Studies, Curtain Walling, Facades, Posts, Restoration & Refurbishment, Retrofit & Renovation, Walls

  • Share
Screen Shot 2018-02-21 at 12.51.36

Let’s dance – russell garden mews

The latest issues of ABC&D covers how Claire and Ian Hogarth recently made the risky decision to inject their personality into their own London family home.

Posted in Articles, Building Industry News, Building Products & Structures, Interior Design & Construction, Interiors, Paints, Paints, Coatings & Finishes, Posts, Retrofit & Renovation

  • Share