Washroom Washroom installs new bathrooms for M4 building

  • 12 May 2017

Washroom Washroom has installed new male and female washrooms as part of the refurbishment of an office in Slough.

The seven storey building at Heathrow Approach, which occupies a strategic position adjacent to the M4, was built 15 years ago and until 2015 was occupied exclusively by Honda.

The building has now been remodelled by construction services company, ISG. A new landscaped approach, redesigned brickwork fin element, atrium and entranceway were all part of the refurbishment. Heathrow Approach now provides Grade A office accommodation and meets modern accessibility standards.

Washroom Washroom installed new male and female washrooms on four levels of the building in both the East and West cores, as part of the multi-million pound project. A new staff shower and changing area was also created by Washroom in the basement.

Washroom’s full height, flush front Alto toilet cubicles were specified with a dark walnut straight grain real wood veneer finish. The cubicle’s rebated edge design provides an attractive virtually seamless facade, while it offers complete privacy for users with its floor-to-ceiling doors.

Washroom’s Concerto integrated duct panel system, which was installed behind the toilets and urinals, was finished in the same real wood veneer to create a smooth finish. The system is designed to be easy-to-clean and allow ease of access for future repairs or maintenance, making it a popular choice for office washrooms.

The crisp white Zodiac stone vanities are comprised of 93 per cent quartz and catch and reflect light.

The staff shower and changing area in the basement features the same white Zodiac stone vanities along with Washroom’s bespoke locker system, also finished in white.

Trevor Bowers, director at Washroom Washroom said: “By using high quality wood veneer for the toilet cubicles in the washrooms, we’ve helped create a sense of cohesion between different areas of the building, which is something that clients are increasingly keen to see.”

Contact:

Washroom Washroom Ltd.
Units 1-10 Hill Farm
Epping Lane
Abridge
Essex RM4 1TU

Phone: 0800 999 8888

Email: [email protected]

Visit the Washroom Washroom website

Leave a Reply

More articles

Bull Products

Bull sails forward with Norwegian shipyard contract

Bull Products has strengthened its presence in the shipbuilding industry, after securing a partnership with a major Norwegian distributor.

Posted in Articles, Building Industry News, Building Systems, Case Studies, Facility Management & Building Services, Health & Safety, Posts, Security and Fire Protection, Site Preparation

BMI

BMI UK & Ireland launches to the UK construction industry

Following the coming together of Icopal and Monier Redland, and a period of investment in premises, systems and people, BMI UK & Ireland has been formally launched to the construction industry.

Posted in Articles, Building Associations & Institutes, Building Industry Events, Building Industry News, Building Products & Structures, Building Services, Building Systems, news, Posts, Restoration & Refurbishment, Retrofit & Renovation, Roof Edge Protection, Roofs

MCRMA

Troldtekt explores the rise of darker colours in its latest theme

With heavier materials and darker colours being used in more and more projects, Troldtekt is exploring the movement in detail in its latest Theme.

Posted in Acoustics, Noise & Vibration Control, Articles, Building Industry News, Building Products & Structures, Ceilings, Innovations & New Products, Interiors, Paints, Coatings & Finishes, Posts