Washroom Washroom has provided a design solution for a high specification office washroom changing area using its off-site service.
Landmark nine-storey building, 4 Kingdom Street, features various wellbeing design features, from a ‘glass pod’ meeting space to a social rooftop space.
Washroom Washroom worked closely with Allies and Morrison and main contractor Wates Construction to create unique washrooms and showers. Washroom saved time and money by utilising its off-site construction methods, perfecting the design before installation on site.
The full height Alto toilet cubicle doors were trialed off-site by Washroom at the Essex factory to find the ideal colour of the stain to match the solid Douglas fir timber panelling in the reception area. In addition, the cubicles incorporate a bespoke iPad holder and feature a flush front design for a virtually seamless facade.
Washroom also provided a full-size mock-up to create an accurate representation of the finished product. Greg Holme, associate director at Allies and Morrison said: “The washroom mock-up was part of our specification and was vital to the success of this project. Washroom worked closely with us to deliver exactly what we were looking for and I know the client is happy with the end result.”
Once the design was approved, the washrooms were deconstructed and stored safely at the factory ready to be delivered to site when required.
Vanity units were also provided by Washroom, with cast polished concrete tops manufactured by MASS Concrete and integral waste bins. The Tego hinged mirror unit was fitted above the sinks, providing a neat and hidden storage solution.
Finally, a staff shower and changing room area was installed by Washroom in the basement of the building. The area utilises full height Alto FENIX shower cubicles combined with Z style Forza solid grade laminate lockers.
Contact:
Washroom Washroom Ltd.
Units 1-10 Hill Farm
Epping Lane
Abridge
Essex RM4 1TU
Phone: 0800 999 8888
Email: [email protected]
Visit the Washroom Washroom website
The National Audit Office’s recently released report reveals heat pump installations will need to increase 11-fold in order to reach current targets for 2028. Russell Dean, Residential Product Group Director at Mitsubishi Electric, says the following…
Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Facility Management & Building Services, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Plumbing, Publications, Research & Materials Testing, Sustainability & Energy EfficiencyLeading specialist supplier IronmongeryDirect launches its latest catalogue, featuring 230 new and exciting door hardware solutions from exclusive and trusted trade brands.
Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, Building Industry News, Building Products & Structures, Building Services, Doors, Facility Management & Building Services, Innovations & New Products, Interior Design & Construction, Interiors, Publications, Restoration & Refurbishment, Retrofit & Renovation, Security and Fire ProtectionFreefoam Building Products announces the release of a new edition of their cladding product brochure – The Complete Cladding Solution.
Posted in Articles, Building Industry News, Building Products & Structures, Cladding, Innovations & New Products, Publications, Restoration & Refurbishment, Retrofit & Renovation, WallsLeading stairlift and home lift company Stannah has been named a Which? Recommended Provider for Stairlift Brands for the second consecutive year.
Posted in Accessibility, Articles, Awards, Building Associations & Institutes, Building Industry Events, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Facility Management & Building Services, Health & Safety, Interiors, Lifts, Restoration & Refurbishment, Retrofit & Renovation