Yale Lockmaster available on Door-Stop composite doors

  • 16 Apr 2015

The Yale Lockmaster now available on Door-Stop doors

The Yale Lockmaster multi-point lock

The Lockmaster features a combination of hooks and anti-lift bolts for greater security, and its front door application protects from unauthorised access even when the door is unlocked.

  • Secured by Design accreditation
  • BBA certified for security, performance and corrosion resistance
  • 10 year guarantee
  • 15 year service history proves a high level of reliability

The Lockmaster is fully compatible with the Yale Keyfree – also available from Door-Stop – which allows homeowners access their property without a key, using a remote fob or secure PIN code.

Link to more about Lockmaster and the wide range of hardware available on Door-Stop doors

 

Leave a Reply

More articles

GEZE

Extra Safety for Extra Care with GEZE in Kent

Extra safety has been incorporated into an extra care housing development for over 55s, courtesy of a GEZE UK natural smoke ventilation system.

Posted in Architectural Ironmongery, Articles, Building Industry News, Building Products & Structures, Building Services, Case Studies, Doors, Health & Safety, Heating, Ventilation and Air Conditioning - HVAC, Posts, Retrofit & Renovation, Security and Fire Protection, Windows

What to expect from Schlüter at Hard Surfaces 2019

Schlüter-Systems Ltd has announced that it will exhibit at this year’s Hard Surfaces Show.

Posted in Articles, Building Industry Events, Building Industry News, Exhibitions and Conferences, news, Posts

ROCKWOOL wins SIG Supplier of the Year award

ROCKWOOL has been awarded the coveted Supplier of the Year title by SIG, distributor of insulation, dry lining and related products.

Posted in Articles, Awards, Building Industry Events, Building Industry News, Building Products & Structures, Insulation, news

Aggregate Industries’ SuperCurve chosen to resurface Port of Liverpool

Aggregate Industries’ new SuperCurve asphalt solution has demonstrated its ability to withstand high-levels of HGV traffic during a recent resurfacing project.

Posted in Articles, Building Industry News, Building Products & Structures, Civil Engineering, Hard Landscaping & Walkways, Landscaping, Posts, Retrofit & Renovation, Sustainability & Energy Efficiency