Aggreko

Aggreko: What role can dehumidifiers play at flood-hit construction sites?

  • 13 Feb 2020

As the UK experiences torrential rain and storm-level events, contractors need to consider the long-term damage ‘invisible water’ can have on their floodhit construction sites, say Aggreko.

The company believes that, although site workers and managers may think assessing damage and replacing equipment is the final recovery step after pumping out floodwater, water soaked into materials could prove catastrophic in the long term.

By soaking into substances such as wood, plaster and paint, this ‘invisible water’ may cause expensive long-term damage to affected materials as site managers heat flooded buildings to aid the drying out process.

What’s more, mould growth can occur during this process, putting the health of on-site personnel at risk.

Delivering optimum climate control in industrial environments is therefore vital to preserving the integrity of affected buildings and ensuring construction can restart safely.

Aggreko

Through the use of dehumidifiers to create a controlled environment and manage moisture levels, site managers can guarantee that surrounding air is dried appropriately and without risk following floods.

Ryan Stanley, Sector Development Manager for Temperature and Moisture Control at Aggreko, commented: “In the event of a flood, it is extremely important that the recovery process happens quickly.

“Yet quickly does not always mean safely – in the rush to continue construction, crucial steps can be missed when drying out buildings.

“It is vital that a controlled environment is maintained when drying and dehumidifying affected rooms and equipment. With that in mind, industrial dehumidifiers, such as those from Aggreko, should be a top priority for site managers struck by flooding.

“If the worst does occur, these temporary solutions can be hired to manage moisture levels until the site is back and running as normal, with the threat posed by ‘invisible water’ eliminated.”

Visit the website

Leave a Reply

Latest news

Uzin

Uzin Utz Group announces all plastic canisters now made from 100% recycled plastic

Sustainability is at the heart of the Uzin Utz Group’s corporate philosophy and the majority of its product developments have been based on making them more environmentally friendly.

Posted in Articles, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Floors, Site Preparation, Sustainability & Energy Efficiency, Waste Management & Recycling

Kingspan

New Kingspan TEK visitor centre is a rare breed

Cotswold Farm Park features the outstanding envelope performance of the Kingspan TEK Building System of Structural Insulated Panels (SIPs).

Posted in Articles, Building Industry News, Building Products & Structures, Case Studies, Insulation, Posts, Restoration & Refurbishment, Retrofit & Renovation, Walls

REHAU

REHAU supplies first stage of future district heating network

The Regional Performance Centre (RPC) Dundee at Caird Park, Dundee, is marking the beginning of a district heating revolution for the area, with help from REHAU.

Posted in Articles, Building Industry News, Building Services, Case Studies, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Pipes, Pipes & Fittings, Plumbing, Posts, Retrofit & Renovation

GGF

GGF gets government confirmation on showrooms re-opening

The GGF has received plenty of queries on whether or not Showrooms can be re-opened, following the Government’s Guidance on working in people’s homes being released on 11 May.

Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Glass, Glazing, Health & Safety, news