Door Group, a unit of ASSA ABLOY Opening Solutions UK & Ireland, is stressing the need for greater awareness of fire safety in education buildings, with a large percentage of fire doors in schools found to be non-compliant while undergoing inspections.
The Regulatory Reform (Fire Safety) Order 2005 requires schools to undertake risk assessments to identify the general fire precautions needed to safeguard the safety of occupants in case of fire, including their safe means of escape.
Despite this, recent research[1] showed that schools have been hit by 2,300 fires in the last five years, destroying 47 primary and secondary school buildings alone.
Fire doors are one of the most important safety features in a building, and regular product specifications or dedicated fire door inspections are essential to fully ensure health and safety measures are met.
Education buildings can present highly specific requirements for fire doorsets, with particularly varied legislation and building regulations surrounding fire doors in schools.
These doors are subject to extremely high levels of traffic, and subsequently a higher level of misuse and abuse, which can then lead to functional problems resulting in non-compliance.
Brian Sofley, Managing Director of ASSA ABLOY Door Group, explains: “Whilst statutory inspections are being completed for the entire building, the necessary attention to fire door compliance is being overlooked.
“Our team of BRE qualified engineers have found a large percentage of fire doors to be non-compliant when completing a dedicated fire door inspection in schools over the past 3 – 4 years. For example, in one school, 163 of the 164 fire doors we inspected were not fire compliant.”
The economic and social impact of school fires on staff, pupils, and the local community can be significant, causing financial hardship, emotional trauma, and a delay in learning.
A study[2] found that 17% of schools who had experienced a fire said it had led to a drop in staff morale, 6% to a drop in morale amongst pupils and 7% said that their fire had led to negative publicity about their school.
Door Group is committed to raising the standard of fire door safety in schools, providing a fully comprehensive inspection which can be carried out every three, four, six or twelve months to suit specific requirements.
Following inspections, Door Group then offer detailed reports containing advice and recommendations on necessary improvements, with the knowledge that identifying any potential issues that could impact safety and product performance can be lifesaving.
If any issues do occur, a tailored repair proposal is issued to include anything from replacement doors to a regular maintenance program. Door Group inspectors are BRE-certified and will ensure that all fire doors inspected meet all necessary standards and regulations.
Brian adds: “An education building should be a safe and secure place for students and staff, to work and learn. Door Group is committed to making schools, colleges and universities across the UK fire protected.
“With regular and thorough inspections, we can ensure the compliance and performance of fire doorsets in an effort to improve overall fire safety in the educational environment, while minimising the risk that learning could be negatively impacted by a fire.”
For more information on ASSA ABLOY Door Group, click here.
Contact ASSA ABLOY Opening Solutions EMEA Digital and Access Solutions
Dukes Court/Dukes Street
Woking
GU21 5BH
United Kingdom
Web: About us | ASSA ABLOY
Email: [email protected]
Phone: 0049 30 8106 2970
Gatic Ultraslot and Gatic Access Covers from Alumasc Water Management Solutions (AWMS) have been installed at Moin Container Terminal in Costa Rica – the country’s first purpose-built artificial island.
Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Case Studies, Civil Engineering, Drainage Services, Drainage, Guttering, Soffits & Fascias, Facility Management & Building Services, Hard Landscaping & Walkways, Restoration & Refurbishment, Retrofit & RenovationThe acoustic environment inside a highly sustainable sports hall building, which was recently built at a school on the south coast of England, has been optimised with high performance sound absorber panels from Hush Acoustics.
Posted in Acoustics, Noise & Vibration Control, Articles, Building Industry News, Building Products & Structures, Building Services, Case Studies, Facility Management & Building Services, Interior Design & Construction, Interiors, Posts, Restoration & Refurbishment, Retrofit & Renovation, WallsInsight Data is set to cause a stir at UK Construction Week this October by offering guests a menu of solutions designed to achieve improved sales and marketing results.
Posted in Articles, Building Industry Events, Building Industry News, Building Services, Exhibitions and Conferences, Information Technology, Research & Materials TestingDual coloured and slim framed aluminium fenestration solutions from Senior Architectural Systems have helped bring architectural interest to the external façade of a new multi-storey hotel in Coventry.
Posted in Aluminium Products, Articles, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Curtain Walling, Doors, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Walls, Windows