A state-of-the-art new veterinary school, that brings together two of the UK’s gold-standard teaching universities, opens its doors to students. Ventilation from Gilberts Blackpool is playing a crucial role.
Alicante Port, the well renowned commercial and cruise ship terminal, has undergone an upgrade to benefit from a Gatic Slotdrain high-capacity surface water drainage system.
Treating water as a precious resource, Hydrorock’s Sustainable Drainage System (SuDS) absorbs and retains rainwater onsite and disperses it as evenly as possible.
After around nine years of construction, the Humboldt Forum is gradually opening its doors. It features the electronic eCLIQ locking system from ASSA ABLOY Opening Solutions.
CUPA PIZARRAS’ Heavy 3 slate has been used to rebuild a previously run-down village hall, into An Talla Loch Ness Visitor Centre, a visitor gateway to Loch Ness and the Caledonian Canal.
Stannah have installed a passenger lift to the new extension to the Countess of Brecknock Hospice, a specialist palliative care facility that opened in 1990.
One of London’s main railway stations, which underwent a £700 million redevelopment, features a blast-resistant ceiling from Hunter Douglas Architectural.