GEZE UK opens the doors for new Universal Music building

  • 2 Dec 2019

GEZE UK recently supplied two automatic circular sliding doors, a statement entrance to 4 Pancras Square.

4 Pancras Square is one of a cluster of new buildings that have led to the emergence of Kings Cross as a creative hub.

They are a statement piece to the 11-storey angular building which reflects the area’s lineage as a former goods yard to King’s Cross railway. With an exposed weathered steel frame, Eric Parry Architects’ building echoes the industrial revolution which enabled the expansion of London.

Positioned side by side, the two Slimdrive SCRs provide a 360° drive solution combining high-performance with unobtrusive operation – the drives are just 7 cm in height and very discreet – and as pass doors are not needed, they maintain the clean aesthetics of the glazed facade.

Focchi undertook the installation of the façade: glazing, entrance and building envelop and worked with GEZE UK to identify the right solution – moving away from an original design featuring revolving doors which would have prompted requirements for pass doors.

There are also environmental benefits to the Slimdrive SCR selection – having only one set of doors open at a time, reduces heat loss and air pollution. Emergency buttons on reception were also added to immediately close the doors and prohibit the building being surged by fans in the wake of a visiting celebrity!

There is also bespoke lettering in the canopy of the Slimdrive SCR which was laser cut by GEZE UK and bespoke bronze lettering was added.

In addition, GEZE’s Slimdrive SL NT automatic sliding door with access control was also utilised, allowing workers to access a cycle ramp, meaning that they can ride straight up to a cycle store – an ideal solution for city commutes.

The Slimdrive SL NT is a good solution for buildings with high levels of footfall and a continuous flow of people moving in various directions. Almost invisible, it is virtually silent in operation and can move leaf weights of up to 125kg.

In addition, there are eight pairs of TS 550 floor springs fitted to retails units within the building. This provides an option to automate the entrances in the future– effectively ‘future proofing’ them.

Extensive rooftop gardens were added to the office block, which were intended to evoke a ‘windswept moorland’ and provide a peaceful oasis in the midst of the city with panoramic views across London.

Contact:

GEZE UK,
Blenheim Way,
Fradley Park,
Lichfield,
Staffordshire,
United Kingdom,
WS13 8SY

Phone: 01543 443000
Fax: 01543 443001

Visit the GEZE UK website

Leave a Reply

Latest news

ROCKWOOL® launches on-demand virtual product experience

ROCKWOOL has launched the next generation in virtual product experiences, allowing customers to explore its non-combustible insulation solutions on their terms.

Posted in Articles, BIM, Infrastructure & CAD Software, Building Industry News, Building Products & Structures, Information Technology, Innovations & New Products, Insulation, Walls

REHAU
Granada

Granada secondary glazing noise reduction delights radio broadcaster

‘I just cannot believe how quiet it is’ exclaimed a radio broadcaster to his wife after secondary glazing manufactured and supplied by Granada Glazing was installed throughout their period Buxton property.

Posted in Acoustics, Noise & Vibration Control, Aluminium Products, Articles, Building Industry News, Building Products & Structures, Building Services, Building Systems, Glass, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Windows

GGF

The lowdown on the GGF collaborating on a Net Zero project

The GGF announces it is working with British Glass to research the impact glass and glazing has in making buildings more energy efficient and carbon reducing.

Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Glass, Glazing, news, Posts, Research & Materials Testing, Sustainability & Energy Efficiency, Windows