SE Controls

Hampton School uses SE Controls system to provide comfortable learning environment for students

  • 30 Mar 2020

A new sixth form study and careers centre at Hampton School in South West London is using a combined ventilation and smoke clearance system from SE Controls.

This will help provide a comfortable learning environment, with enhanced fire safety for students and staff.
 
Founded over 450 years ago, Hampton School is recognised as one of the UK’s leading independent academic boys’ schools and provides education for 1,200 students, aged 11 – 18, as well as younger pupils through its prep and pre-prep schools.
 
Designed by IID Architects, the new building is constructed as a three-storey pod located in the centre of the school’s Hammond Quad, while a further single storey was added to the existing building at the southern end of the quad and the previously open space was covered with a glazed roof.
 
In addition to meeting the building’s fire protection specification, which demands that fire fighters must be able to actuate the system and disperse smoke on arrival via a manual call point at the main entrance, SE Controls also needed to integrate the ventilation solution into the BMS to provide comfort ventilation and temperature control in day-to-day operation.
 
To achieve this, 20 SHEVTEC louvred smoke ventilators were installed at high-level in a rooftop plenum and operate as a four-zone system via a dedicated controller, linked to the BMS.
 
This design allows proportional actuation of the vents so they can be opened in stages depending on the temperature within the atrium. The control panel also incorporates a 72-hour battery backup for failsafe operation in the event of power interruption or failure.
 
As the ventilation system must also operate in the event of a fire, all the ventilators and control systems supplied by SE Controls are manufactured and tested in accordance with BS EN 12101 part 2 and part 10, as well as being compliant with other relevant product legislation, regulations and standards.
 
Although the louvres are all 1,280mm in height, five different widths were used on the project, ranging from 1,430mm to 1,854mm, enabling them to fit within the structural glazing system’s dimensions.
 
The range of sizes also ensures the building’s ventilation air flow requirements are met, as the vents provide a minimum of 50% free area when partially open.

Also, to simplify ongoing servicing and maintenance requirements, the ventilators are controlled using externally mounted IP65 rated electric motors.
 
In normal comfort mode, the motors open and close the louvres depending on the level of cooling and ventilation needed within the atrium, which is managed by the school’s BMS.

If the building’s fire alarm system is actuated, it over-rides the BMS and all the vents are closed until the fire services arrive and actuate the system to manage how the smoke is cleared to assist fire-fighting procedures.
 
Dave Furneau, SE Controls’ Senior Contracts Manager on the project, commented: “The new sixth form centre is a very clever piece of design, especially in the way that an existing space has been reconfigured to extend the teaching facilities and house the school’s careers centre.

“We’re delighted to have been part of this new building and use our expertise to help maintain comfort levels and add to the fire safety strategy.”

Contact:

SE Controls,
Lancaster House,
Wellington Crescent,
Fradley Park,
Lichfield,
Staffordshire,
WS13 8RZ

Visit SE Controls's website

Leave a Reply

Latest news

PCA

Damp diagnostic a ‘game changer’ for property care - PCA

A five-year partnership between industry and academia has resulted in a ground-breaking diagnostic tool, the Building Moisture Index from the Property Care Association (PCA).

Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Damp & Waterproofing, Facility Management & Building Services, Health & Safety, Innovations & New Products, Video of the Week

Clyde

Clyde Radiators launches new website

Clyde Radiators, specialist in bespoke heating solutions, has relaunched its website to make it simpler than ever for customers to obtain quotes and specifications for any residential or commercial project.

Posted in Articles, Building Industry News, Building Services, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Information Technology, Innovations & New Products, Plumbing, Posts

Pop Up Power Supplies

Rediscovering life and work in our town centres with Pop Up Power Supplies

Pop Up Power Supplies®’ range is used extensively by local authorities, city centre managers and shopping centre operators nationwide.

Posted in Articles, Building Industry News, Building Services, Facility Management & Building Services, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, news, Site Preparation

ASSA ABLOY

ASSA ABLOY Project Specification Group unlocks BIM potential for architects and specifiers with Openings Studio™

When it comes to doorsets and ironmongery, using applications such as Openings Studio™, from ASSA ABLOY Project Specification Group, can truly unlock the potential of BIM.

Posted in Architectural Ironmongery, Articles, BIM, Infrastructure & CAD Software, Building Industry News, Building Products & Structures, Doors, Facility Management & Building Services, Information Technology, Innovations & New Products