Hemsec

Hemsec: Supply partnership enables continued production of high-quality SIPs-built Garden Rooms

  • 11 Aug 2021

JML SIPs and Hemsec have worked together for nearly 10 years, with Hemsec manufacturing the SIPs, and JML creating homes from them, for clients across the UK.

There has been an increasing demand recently for SIPs Garden Rooms.

Especially since COVID, new home-based lifestyles have become the norm and people are looking for ways to improve their mental and physical wellbeing whilst still at home.

Hemsec

SIPs Garden Rooms enable extended living spaces which stay cool in the summer and warm in the winter, requiring little if any heating or cooling. Gyms and yoga studios, home offices, extra bedrooms and living rooms are all relatively easy to create using SIPs.

The partnership between JML and Hemsec means that the two companies have been able to plan and respond to materials shortages together, and to continue to supply this growing demand.  

Using Hemsec SIPs, JML supplies bespoke designed SIPs buildings. This is as well as SIPs kits for those who want to use their own contractors.

The UK construction market is increasingly recognising the key benefits that a SIPs building provides:

 – super-insulation qualities: Cool in summer, warm in winter – all-round use
 – space utilisation
 – low maintenance
 – durability
 – design flexibility

Fast building times – around two weeks to supply and install

In most cases, it takes around two weeks to supply and install a Garden Room. This is far faster than more traditional building methods, and fewer workers are needed.

The structure can be up within two days, meaning the internal works can be finished off without the need to rely on the weather. It’s important, however, to use precision-manufactured SIPs, which ensure a high-quality result.

Precision manufactured SIPs

The Garden Rooms market is expanding rapidly with a number of new entrants joining the sector; however, few can match JML’s experience and track record.  

The company has full accreditations for house building as well as smaller projects; this enables it to deliver a wide range of larger projects such as school classrooms, care home extensions and hotels. This professionalism and commitment to excellence has paid dividends. In 2018, JML supplied and erected the SIPs kit for the RIBA House of the Year.

A key ingredient of JML’s continued success and growth is the high quality of the SIPs they use.  The company works almost exclusively with Hemsec, because of the consistent quality of its panels, its value for money, and great customer service.

Both JML and Hemsec understand the importance of absolute precision in the manufacture of the panels.

Hemsec SIPs are BBA Certified and are extensively tested for Structural, Acoustic and Thermal properties, including Fire Resistance. Hemsec manufactures SIPs with laser precision accuracy to ensure that the SIPs are square, providing uniformity and requiring no additional manipulation.

JML has total confidence that when the panels arrive in its processing factory, team members are able to cut the materials to size easily, ready for use with the both kits and bespoke Garden Room designs.

The two companies are proud of their long-standing relationship and partnership. They share a commitment to sustainability, focused on the need to construct low energy homes and buildings as a key part of the Net Zero Carbon building agenda.

Enabling people and their families to live and work more locally will contribute positively to this goal; and SIPs Garden Rooms can play a part in achieving this.

Contact Hemsec:

Stoney Lane,
Rainhill,
Merseyside
L35 9LL

T: 0151 426 7171
E: [email protected]

Visit the Hemsec website

Leave a Reply

Latest news

Origin
Mitsubishi Electric
Hamworthy

Hamworthy Heating expands CIBSE approved CPD modules with new hot water series

Hamworthy Heating, technical experts in commercial heating and hot water products, announce the expansion of its market leading CIBSE approved Continuing Professional Development (CPD) portfolio with the launch of three new learning modules.

Posted in Articles, Building Industry Events, Building Industry News, Building Products & Structures, Building Services, Continuing Professional Development (CPD's), Facility Management & Building Services, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Plumbing, Retrofit & Renovation, Seminars, Training

Passivent