Stannah discusses Part M & Part B Building Regulations and lifts

  • 5 Aug 2019

The Building Regulations, Approved Document M (Part M) and Part B give direction on lifts in all types of buildings. Stannah discusses what these mean and gives a helpful outline to the building regulations guidance surrounding lifts.

The Building Regulations, Approved Document M (Part M) gives direction on lifts in all types of buildings, stating that reasonable provision must be made for people to gain access to and use the building’s facilities. Part B, on the other hand, gives guidance on fire-rating lifts or the area surrounding them as well as further detail on firefighting and evacuation passenger lifts. 

What is Part M?

In the latest Approved Document M (2015 edition) there are two volumes: Volume 1 for dwellings and Volume 2 for Buildings other than dwellings (all other building types). Volume 2 gives direction on enabling a public access building to conform to the Equality Act (formerly DDA) and Section 3 sets the objective for the horizontal and vertical circulation of people in buildings as: “For all people to travel vertically and horizontally within buildings conveniently and without discomfort in order to make use of all relevant facilities. This objective relates in the main, but not exclusively, to the provision of sufficient space for wheelchair manoeuvre and design features that make it possible for people to travel independently within buildings.”

In order to help achieve this objective a series of design considerations for the vertical circulation of the building are covered which includes the most suitable type of lift and specific considerations and requirements for each lift type.

3.21 For all buildings, a passenger lift is the most suitable form of access for people moving from one storey to another.

3.22 For existing buildings, and in exceptional circumstances for new developments with particular constraints (e.g. a listed building or an infill site in a historic town centre), where a passenger lift cannot be accommodated, a vertical lifting platform (enclosed platform lift), although not equivalent to a passenger lift, may be considered as an alternative option to provide access for persons with impaired mobility.

3.23 In exceptional circumstances in an existing building, a wheelchair platform stairlift (open platform) may be considered, provided its installation does not conflict with requirements for means of escape.

Moreover, Part M states that the preferred solution to enable disabled access is a passenger lift, particularly for new developments and BS8300 recommends at least one or more type of lift. In addition, it also recognises that it may not always be possible for a building to accommodate one on either a new or existing development, due to site constraints it cannot be accommodated. In these instances to achieve a Part M compliant lift a lifting platform (platform lift) or as a last resort a wheelchair platform stairlift will be considered.

In selecting the most suitable lifting device care should always be taken to ensure it is fit for purpose, considering the relevant lift and Health & Safety Regulations. If your building needs to comply with Part M, then a recommended minimum footprint size is as follows:

Once you know what product you require it is always worth stating to your chosen lift supplier that you require at Part M compliant or ‘Part M lift’. 

Of course, compliance to Part M is just one of the many factors to evaluate when choosing the right type of lift, or lifts, for your building project. Click here to read more about what Stannah recommends you consider when choosing a lift.

Stannah,
Watt Close,
East Portway,
Andover,
Hampshire,
SP10 3SD,
United Kingdom

Phone: 01264 343777
Fax: 01264 337942

Visit Stannah's website

Leave a Reply

Latest news

Axion

Axion Polymers renews ISO 9001 certification and gains new H & S standard

Axion Polymers has successfully renewed its current ISO management system certification and gained the new enhanced ISO45001 Health and Safety standard at its two Manchester materials recycling sites.

Posted in Articles, Building Industry News, Building Regulations & Accreditations, Building Services, Posts, Site Preparation, Sustainability & Energy Efficiency, Waste Management & Recycling

REHAU

Underfloor heating and smart control questions answered by REHAU

Contractors must be prepared for the growing popularity of smart control technology in residential and commercial building heating systems, according to a new downloadable guide from polymer specialists REHAU.

Posted in Articles, Building Industry News, Building Services, Floors, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Information Technology, Innovations & New Products, Plumbing, Posts, Publications

Encasement

Building services concealed by Encasement at new Bedfordshire University STEM labs

The University of Bedfordshire’s new four-storey science, technology, engineering and mathematics (STEM) building features 80 Forma decorative casings from Encasement.

Posted in Aluminium Products, Articles, Building Industry News, Building Products & Structures, Building Systems, Canopies, Entrances & Column Casings, Case Studies, Interior Design & Construction, Interiors, Posts, Restoration & Refurbishment, Retrofit & Renovation, Walls

GGF

GGF concern over Green Scheme scam reports

Following the Government’s announcement of the Green Homes Grant Scheme, the Glass and Glazing Federation (GGF) has received several reports of rogue companies trying to scam homeowners. 

Posted in Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Glass, Glazing, news, Posts, Sustainability & Energy Efficiency, Windows