Stannah

Stannah passenger lift rebuilds access in chapel restoration

  • 21 Nov 2018

The Chapel at Royal Victoria Country Park is open to the public following a £3.5m restoration, with access for people of all mobilities ensured by a Stannah passenger lift.

Opened by Queen Victoria in 1863, this Grade II iconic building is the last remaining element of the British Army’s first purpose-built military hospital.

Damaged by fire in 1966, it has been fully restored thanks to the Heritage Lottery Fund and Hampshire County Council.

The eight-person traction lift is Equality Act 2010 compliant and complements stair access to bring freedom of movement between three floors for people of all mobilities – from wheelchair users to those with prams or lots of bags.

Stannah

From the ground-floor reception and free exhibition to the first-floor viewing gallery and second-floor tower access, the lift guarantees everyone can appreciate the Green Flag Award-winning Chapel’s former role as a spiritual focus – not only for the wounded of the Boer War and both World Wars but also for the people dedicated to rebuilding them.

Situated in an existing stairwell, the lift had to be installed within Historic England guidelines – this included the guide brackets not being able to be fitted to the Chapel’s historic walls, meaning the lift was supplied and fitted within Stannah’s FX structure; a cost-efficient, shaft-within-a-shaft solution that overcomes such obstacles.

Stannah

This BS 9999-compliant evacuation lift plays a crucial role in an evacuation strategy by a designated warden for those less ambulant – the emergency intercom system and backup power supply afford maximum reassurance.

Pleasing presentation is also assured; from the satin stainless-steel car doors and hand rails to the laminated-sand interior walls, downlighter bubble ceiling, silver half-height rear mirror and non-slip floor.

Jo Monro, Stannah Marketing Manager, commented: “The Stannah passenger lift installed as part of the Chapel’s restoration illustrates our capability to deliver access solutions to niche sectors throughout the UK, including Historic England listed buildings and the constraints this may impose.”

As with all Stannah lift products, this Stannah passenger lift is covered by Stannah’s comprehensive lift service plan, which includes six service visits in the first year, with continued lift maintenance by the Southern England branch of Stannah Lift Services, part of a nationwide network providing comprehensive lift servicing and support.

Leave a Reply

Latest news

Mitsubishi Electric

Mitsubishi Electric set to host CIBSE Journal webinar

Mitsubishi Electric will host a CIBSE Journal webinar on Wednesday 24th April 2024 at 1pm to discuss the legislation and initiatives driving changes in the way we will need to heat, cool and ventilate large commercial buildings to reach net zero emissions in the UK.

Posted in Air Conditioning, Articles, Building Industry Events, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Facility Management & Building Services, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Information Technology, Pipes & Fittings, Plumbing, Seminars, Sustainability & Energy Efficiency, Training

Hamworthy

Hamworthy: What to consider when choosing a heat pump?

At the heart of an efficient heat pump system lies an important element: the refrigerant – Jason Allen, Commercial Product Manager, Groupe Atlantic UK, ROI & NA. Hamworthy Heating is a Groupe Atlantic brand.

Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Facility Management & Building Services, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Pipes & Fittings, Plumbing, Retrofit & Renovation, Sustainability & Energy Efficiency

Kingspan

EJOT Colorfast chosen for Kingspan’s highly sustainable new Asian factory

More than 120,000 EJOT Colorfast self-drilling fasteners have helped Kingspan to create a thermally superior, visually-appealing building envelope for its first purpose-built manufacturing plant in South East Asia.

Posted in Articles, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Posts, Restoration & Refurbishment, Retrofit & Renovation, Roofs, Sustainability & Energy Efficiency

ASSA ABLOY

ASSA ABLOY helps new manufacturing plant achieve LEED Gold certification

Improving sustainability performance is becoming a higher priority for building developers, owners and users. One consequence is fast-growing demand for green building certifications — and therefore specification. Specialist input can make the difference between hitting and missing a project target, as ASSA ABLOY explains here…

Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, BIM, Infrastructure & CAD Software, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Case Studies, Doors, Facility Management & Building Services, Information Technology, Retrofit & Renovation, Security and Fire Protection, Sustainability & Energy Efficiency