Diamond drilling specialist Castle & Pryor was recently tasked to make a storage warehouse into one open space, removing the central dividing wall and levelling the floor.
The wall was 3.6m high and 180mm thick and 82m long. In order to remove it, the company had to form 127mm diameter diamond drilled holes through the upper part of the wall to act as lifting holes. This would enable a telehandler to hold them steady while the wall was cut free from the floor using a track saw. These planks were then lifted away and removed from site. This technique was chosen so that the wall sections could be re-used on other projects across the estate.
Castle & Pryor made the cuts flush to the floor using a Tyrolit WSE 1217 track saw.
Watch a video of the track sawing here.
The next step was for the company to level the large 54m x 2.9m floor area, by reducing it by 30mm. In order to do this, it first needed to be cut into strips by the Tyrolit 1049 floor saw. This would assist with the breaking out of the concrete. It would also help provide a relatively flat and even finish to the bottom of the rebate.
Upon the completion of the strip cutting, the concrete was broken out using Castle & Pryor’s Husqvarna DXR 145 robot with a wide bolster chisel.
Watch a video of the forming rebate here.
The warehouse will be used for the storage of Winter Wonder Land in Ascot while out of season.
Cistermiser, a leader in water management, has welcomed the ambitious water saving targets for commercial buildings recently set by DEFRA.
Posted in Articles, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Drainage, Drainage Services, Drainage, Guttering, Soffits & Fascias, news, Pipes, Pipes & Fittings, Plumbing, Research & Materials Testing, Sustainability & Energy EfficiencyAssociated Steel Window Services (ASWS) has built a solid reputation far beyond the capital for successfully undertaking some of the most challenging fenestration contracts.
Posted in Architectural Ironmongery, Articles, Building Associations & Institutes, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Facades, Posts, Restoration & Refurbishment, Retrofit & Renovation, Steel and Structural Frames, Walls, WindowsWhat should a developer be considering when looking for kitchen suppliers? The following article is a quick guide from Keller’s Tim Spann…
Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Interior Design & Construction, Interiors, Kitchens, Plumbing, Posts, Restoration & Refurbishment, Retrofit & Renovation, Site Preparation, Sustainability & Energy Efficiency, Waste Management & RecyclingResidents of 84-apartment Eden Court in Lillington, Leamington Spa, now enjoy enhanced accessibility thanks to the comprehensive refurbishment by Stannah of two passenger lifts.
Posted in Accessibility, Articles, Building Industry News, Building Products & Structures, Building Services, Case Studies, Facility Management & Building Services, Health & Safety, Lifts, Restoration & Refurbishment, Retrofit & Renovation