With this year’s Fire Door Safety Week campaign running 20-26 September, Door Group – a unit of ASSA ABLOY Opening Solutions UK & Ireland – is calling for higher standards of fire door inspections in public and commercial buildings to ensure life safety.
Brian Sofley, Managing Director – Door Group, comments: “Fire doors are one of the most important safety features in a building. Whilst providing access around the property they are a critical part of the fire compartmentation requirement.
“We understand the building industry is under constant pressure to drive down costs and deliver services quicker than ever before. However, specification errors, unresolved installation issues and poor maintenance of fire safety products can have devastating consequences.”
Dame Judith Hackitt’s Review of Building Regulations and Fire Safety suggested there is a degree of fragmentation within the industry. This has consequently led to ambiguity over where responsibility lies.
Therefore, it is imperative those responsible for the property ensure life safety products have been independently verified, are regularly audited or certified and have been manufactured and installed by competent companies or individuals. It is only then that both buildings and facilities managers and occupants can have total peace of mind.
Brian adds: “We take the view that suppliers and manufacturers have a duty of care to their customers at each and every stage of a project, to offer a solution that is properly and unambiguously safeguarded by certification.
“Every person involved in a project should be aware of the responsibility imposed on them and should treat this as an opportunity to showcase their talents in delivering a quality service.
“Collectively, we need to ensure that fire safety is carried out holistically to ensure thorough due diligence and this includes end-users.”
As part of its commitment to fire door safety, Door Group provide a fully comprehensive inspection. This can be carried out every three, four, six or 12 months to suit specific requirements.
Following inspections, Door Group offers detailed reports containing advice and recommendations on necessary improvements. All this, with the knowledge that identifying any potential issues that could impact safety and product performance can be lifesaving.
If issues occur, a tailored repair proposal is issued to include anything from replacement doors to a regular maintenance program. Door Group inspectors are BRE-certified and will ensure all fire doors inspected meet all necessary standards and regulations.
Door Group is offering a webinar on the importance of fire door safety through its product compliance and inspection services.
This webinar takes place on 29 September 2021 at 1pm. To register for the webinar, click here.
ASSA ABLOY has launched a new fire doorset guide to support Fire Door Safety Week – click here for more.
For more information on ASSA ABLOY Door Group, click here.
Contact ASSA ABLOY Opening Solutions EMEA Digital and Access Solutions
Dukes Court/Dukes Street
Woking
GU21 5BH
United Kingdom
Web: About us | ASSA ABLOY
Email: [email protected]
Phone: 0049 30 8106 2970
Hosted across two days on 17 – 18 May 2023 at ExCeL London, Digital Construction Week (DCW) is set to return for its best year yet.
Posted in Articles, Building Industry Events, Building Industry News, Building Products & Structures, Continuing Professional Development (CPD's), Exhibitions and Conferences, Innovations & New Products, news, Seminars, Sustainability & Energy EfficiencyHush Acoustics has helped the developer of an apartment conversion scheme in a Pennine village to achieve superior sound reduction standards.
Posted in Acoustics, Noise & Vibration Control, Articles, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Building Systems, Case Studies, Ceilings, Floors, Insulation, Interior Design & Construction, Interiors, Restoration & Refurbishment, Retrofit & Renovation, Timber Buildings and Timber Products, WallsAbloy UK announces the appointment of Kevin Birch as its new Regional Specifications Manager in the Republic of Ireland.
Posted in Architectural Ironmongery, Articles, Building Industry News, Building Products & Structures, Building Services, Doors, Facility Management & Building Services, Health & Safety, RecruitmentAs contemporary architecture continues to push design boundaries, Alumasc Water Management Solutions (AWMS) continues to provide trusted industry products and solutions to support modern construction.
Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Civil Engineering, Drainage Services, Drainage, Guttering, Soffits & Fascias, Facility Management & Building Services, Hard Landscaping & Walkways, Innovations & New Products, Landscaping, Restoration & Refurbishment, Retrofit & Renovation