ASSA ABLOY: The real value of Building Information Modelling

  • 28 Jun 2021

In the last few years, Building Information Modelling (BIM) has grown from relative infancy to a critical element in many construction projects. Marc Ameryckx, BIM Manager at ASSA ABLOY Opening Solutions EMEIA, talks about the benefits of a process which is much easier than many imagine.

ASSA ABLOY

Q: For someone who may be totally new to the BIM process — whether an architect, specifier or building contractor — can you explain what it is?

Every building project needs coordination of vast amounts of information to move it from the original idea to bricks and mortar. Fundamentally, BIM is the digitisation of this process.

One important thing to understand is that it’s not just software, and not just the visual model, but rather the process or workflow itself. The 3D renderings so often associated with BIM aren’t only about aesthetics: The data behind the images is very important.

All the products and materials used within a construction process should be included, with as much high-quality data as possible assigned to them. All stakeholders then have access to this centralized source, ‘the model’, which ultimately helps to minimise design and engineering errors. When one stakeholder makes changes, the update propagates through the entire system. Everyone is always up to date.

Effective BIM helps eliminate mistakes before they happen or allows you to identify them as early as possible: The earlier you solve these problems, the less they cost.

Q: For an architect or building planner, what are the key benefits of involving security specialists in their BIM process?

There is a major education benefit for architects and engineers, who are often not aware of the complexity of doors and security solutions. 

As security solutions have developed and become more sophisticated, so has their impact on the overall building environment. If doors, entrances and access control solutions don’t have the features required by the building manager from the outset, it can become a real challenge to implement this at a later stage.

Security systems are expensive and now crucial components within buildings. They should be factored in as early as possible. Partnering with a security manufacturer who has BIM expertise is the best way to do this.

Q: Beyond design and construction stage, can an effective BIM process deliver benefits further down the line?

BIM has benefits through a building’s full life-cycle. If good quality data is put in at the start of the process, there are obvious long-term benefits for those maintaining and controlling the building once occupation begins. For example, the more data you have on the security products and solutions you have, the better you can maintain the building and act when needed.

Security managers should be pushing BIM workflows and data quality, so they can use the ‘as built’ model in their assessments and understand systems that have been selected. If specifiers are thinking about security devices early in the process, this data is available for future use by maintenance or in consultation if something goes wrong.

Rather than having lots of documents stored in different places — many of which inevitably get lost or misplaced — a centralised, easily accessible BIM ecosystem will have all the data available that is required.

Q: It all sounds slightly futuristic. Is this something stakeholders should be looking at now? Or planning for the longer term?

BIM is quickly moving to centre-stage, especially in complex and/or public building projects. Its benefits are too great to ignore: in cost reduction, on-time delivery, futureproofing buildings and creating a trustworthy data store for facilities management down the line.

For anyone who wants to get the most from their building over its full life-cycle, BIM is becoming a must.

Q: Looking further forward, where does the future of BIM lie?

In short, with better data and more sophisticated applications of that data. For example, we’re beginning to see the development of ‘digital twins’. Users can create a digital twin of a building to simulate different situations in advance, to find out what may happen if systems are changed. For instance, security managers could assess the impact of implementing an upgraded access control solution, reducing the risk of unforeseen complications. This ultimately relies on high-quality, accessible data.

The BIM process can sound daunting, as can the specification of security devices and solutions. This is why we have established regional ASSA ABLOY Opening Solutions BIM and Specification teams across the EMEIA region. Digitisation of the entire building design and construction process has already begun. We have the expertise to help architects, specifiers, planners and building contractors to offer effective, efficient BIM service.

ASSA ABLOY Opening Solutions BIM consultants have experience supporting projects, ranging from a single door up to 15,000. To learn more, click here

Contact ASSA ABLOY Opening Solutions EMEA Digital and Access Solutions

Dukes Court/Dukes Street
Woking
GU21 5BH
United Kingdom

Web:  About us | ASSA ABLOY
Email: [email protected]
Phone: 0049 30 8106 2970

 

Leave a Reply

Latest news

Recofloor

Recofloor scheme is 'brilliant for our business'

Deploying the Recofloor scheme on all their commercial and social housing flooring contracts is second nature to County Contract Flooring.

Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Case Studies, Facility Management & Building Services, Floors, Site Preparation, Sustainability & Energy Efficiency, Waste Management & Recycling

RENSON

RENSON: Artfully designed awnings to protect loggias in student residence

In Aspholz, Zurich, a seven story student residence has been built to accommodate 332 students in 30 apartments and 11 studios, making it the largest of its kind in Zurich – a RENSON blind features there…

Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Case Studies, Facades, Restoration & Refurbishment, Retrofit & Renovation, Walls

CUPA
MCRMA

MCRMA and SPV Training Solutions join forces to increase training opportunities

The MCRMA is collaborating with the specialist division of member-company SPV Special Projects to expand the opportunities for training and skills development.

Posted in Articles, Building Associations & Institutes, Building Industry Events, Building Industry News, Building Products & Structures, Building Services, Building Systems, Cladding, Restoration & Refurbishment, Retrofit & Renovation, Roofs, Training, Walls