Gilberts

Improved Smoke Protection with Gilberts Blackpool

  • 17 May 2022

Series 61 (S61) is the latest smoke control damper to come to market from Gilberts, Britain’s leading independent air movement specialist. 

The single ‘door sized’ S61 compliments the company’s established, successful UKCA certified and CE marked Series 60 (S60) smoke evacuation damper.

The new S61 has been designed, tested and certified to EN1366-2, EN1366-10 and EN12101-8 in both open-to-closed and closed-to-open (with its associated grille attachment).

 

Gilberts

 

It has attained ES classification for integrity and smoke in air leakage tests, exceeding current legislative requirements and guidance. As its counterpart Series 60, S61 is manufactured from galvanised steel and will provide up to 120 minutes’ smoke and fire integrity.

Providing up to one square metre of geometric free area within a 800mm x 1920mm opening list size, S61 delivers a unit specifically to suit mechanically ventilated smoke shafts, with its enhanced air leakage reduction. Front access actuators and grille alignment brackets further simplify installation, operation and maintenance.

Ian Rogers, Gilberts’ Sales Director, comments: “Series 60 goes from strength to strength: we believed it was the best of its kind when launched, and that has been reinforced with its attainment of certification for maintenance of opening confirmation.

“It remains the ‘go to’ option. Series 61 is engineered to offer specifiers an alternative with improved area and smoke leakage when exceptional capability is demanded, with an increase in size to suit mechanically ventilated shafts and enhanced leakage reduction.”

The development of S61 builds on Gilberts’ 60+ years’ heritage of bringing to market advanced technology that enhances the design, installation, energy efficiency and occupier comfort of non- domestic buildings. 

All Gilberts’ products – standard lines and bespoke solutions – are designed, developed, manufactured and tested in accordance with BS EN ISO 9001:2015 quality standard in the company’s state of the art 95,000 square foot facility in Blackpool.

Contact:

Gilberts of Blackpool,
Gilair Works,
Clifton Road,
Blackpool,
FY4 40T

Phone: 01253 766911
Fax: 01253 767941

Visit Gilberts of Blackpool's website

Leave a Reply

Latest news

Mitsubishi Electric

Mitsubishi Electric set to host CIBSE Journal webinar

Mitsubishi Electric will host a CIBSE Journal webinar on Wednesday 24th April 2024 at 1pm to discuss the legislation and initiatives driving changes in the way we will need to heat, cool and ventilate large commercial buildings to reach net zero emissions in the UK.

Posted in Air Conditioning, Articles, Building Industry Events, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Facility Management & Building Services, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Information Technology, Pipes & Fittings, Plumbing, Seminars, Sustainability & Energy Efficiency, Training

Hamworthy

Hamworthy: What to consider when choosing a heat pump?

At the heart of an efficient heat pump system lies an important element: the refrigerant – Jason Allen, Commercial Product Manager, Groupe Atlantic UK, ROI & NA. Hamworthy Heating is a Groupe Atlantic brand.

Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Facility Management & Building Services, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Pipes & Fittings, Plumbing, Retrofit & Renovation, Sustainability & Energy Efficiency

Kingspan

EJOT Colorfast chosen for Kingspan’s highly sustainable new Asian factory

More than 120,000 EJOT Colorfast self-drilling fasteners have helped Kingspan to create a thermally superior, visually-appealing building envelope for its first purpose-built manufacturing plant in South East Asia.

Posted in Articles, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Posts, Restoration & Refurbishment, Retrofit & Renovation, Roofs, Sustainability & Energy Efficiency

ASSA ABLOY

ASSA ABLOY helps new manufacturing plant achieve LEED Gold certification

Improving sustainability performance is becoming a higher priority for building developers, owners and users. One consequence is fast-growing demand for green building certifications — and therefore specification. Specialist input can make the difference between hitting and missing a project target, as ASSA ABLOY explains here…

Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, BIM, Infrastructure & CAD Software, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Case Studies, Doors, Facility Management & Building Services, Information Technology, Retrofit & Renovation, Security and Fire Protection, Sustainability & Energy Efficiency