More power and connectivity with GEZE upgrade

  • 9 Mar 2022

GEZE has completely upgraded their control panels for smoke and heat extraction systems. Control units are the brain and the power supply of the smoke and heat extraction systems in a building.

The new THZ N4 and THZ Comfort replace the previous versions and offer a more powerful power supply, increased connectivity and easier installation. 

GEZE

In addition to extracting smoke from staircases the THZ N4 and THZ Comfort can also be used for smaller smoke and heat extraction systems such as a foyer and are suitable for use on new buildings and retrofitting. In large event venues with smoke extraction installed in the roof or with a machine smoke extraction system the THZ N4 is particularly suited for operating fresh air drives such as GEZE’s RWA K 600.

Upgrade

Both versions have received a hardware and capability upgrade; the more powerful power supply enables an increased output of 4.5A from the 3.4A in previous models which broadens the panel’s specification possibilities and allows more drives to be connected. 

The motor line connection has also been upgraded to a spring level motor terminal to allow for easier installation and both can now be interfaced with the GEZE ST 220 service terminal for quick and easy commissioning. 

Both control panels have a compact and attractive design; the THZ N4 has a plastic housing in white whilst the THZ Comfort has a robust metal housing in orange. 

Andy Iredale, National Sales Manager for Automatic Doors and Window Control, comments: “These new control units offer even more options for smoke and heat extraction as more drives can be connected due to the more powerful power supply which in turn allows more options on where they can be used.” 

To find out more about the THZ N4 or THZ Comfort visit GEZE’s website or for a brochure email [email protected].  For more information on GEZE’s comprehensive range of door and window control products visit www.geze.co.uk

Contact:

GEZE UK,
Blenheim Way,
Fradley Park,
Lichfield,
Staffordshire,
United Kingdom,
WS13 8SY

Phone: 01543 443000
Fax: 01543 443001

Visit the GEZE UK website

Leave a Reply

Latest news

Kingspan

EJOT Colorfast chosen for Kingspan’s highly sustainable new Asian factory

More than 120,000 EJOT Colorfast self-drilling fasteners have helped Kingspan to create a thermally superior, visually-appealing building envelope for its first purpose-built manufacturing plant in South East Asia.

Posted in Articles, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Posts, Restoration & Refurbishment, Retrofit & Renovation, Roofs, Sustainability & Energy Efficiency

ASSA ABLOY

ASSA ABLOY helps new manufacturing plant achieve LEED Gold certification

Improving sustainability performance is becoming a higher priority for building developers, owners and users. One consequence is fast-growing demand for green building certifications — and therefore specification. Specialist input can make the difference between hitting and missing a project target, as ASSA ABLOY explains here…

Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, BIM, Infrastructure & CAD Software, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Case Studies, Doors, Facility Management & Building Services, Information Technology, Retrofit & Renovation, Security and Fire Protection, Sustainability & Energy Efficiency

Strand

GEZE UK – accredited as a Living Wage company

GEZE UK is delighted to announce that the company has been accredited as a Living Wage Employer. The real Living Wage is the only UK wage rate based on the cost of living.

Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, Building Industry News, Building Products & Structures, Building Services, Doors, Facility Management & Building Services, news, Security and Fire Protection