IG Masonry Support

Sparking architectural ambitions on the Residence Project – an IG Masonry Support article

  • 2 Nov 2018

In a series of articles which has seen IG Masonry Support ask some of its engineers to describe their favourite architectural project, Harry Robinson explains how a bespoke design was needed to form his favourite architectural feature.

IG Masonry Support

This is the Residence project – which features a striking double arch at the entrance – is a luxury residential development situated on London’s South Bank.

The IG team were given the task of developing almost 140 brick slip arches, which helped to create intricate brick elements offsite to guarantee a supreme level of quality whilst saving time on site, thus reducing the need for skilled labour. 

IG Masonry Support

What challenges did this project present?

This project incorporated many unprecedented bespoke designs and therefore presented many challenges, one of which being the double brick slip arch lintel.

As the two arches were so close together and sat on a narrow pier, there was insufficient bearing zone on this pier to have two separate arches so we had to develop a solution to accommodate these requirements.

Another challenge was that some of the full arches had very deep soffits meaning we had to develop a solution using two separate arches to keep the weight down and make it easier to install.

What solutions were developed to overcome these challenges and why did you choose these options?

To overcome the double brick slip arch challenge, we designed the arches as one prefabricated unit, which then just needed to be lifted in to place.

Creating this double arch made the production very complex in terms of the steelwork fabrication, it also meant we required small cut infill bricks between the arches and either side, we decided to cut these bricks and bond them to the lintels in our controlled factory environment which allowed more accuracy and helped speed up the build on site.

The full arches that were made separately had to be bricked up in tandem to ensure all the bricks aligned. We also tested the arch installations in our factory to ensure they lined up perfectly prior to delivering them to site.

What is your favourite architectural feature on this project?

My favourite feature on this project is where the two full arches with deep soffits meet adjacent to each other on the same corner pier.

Both arches were bearing on the same pier internally and met at the same point, which meant the steel of one arch had to be notched around the other, and brickwork from one arch had to run into the brickwork of the other.

This is not something anyone would really notice on initial inspection, unless you were part of the great deal of work that was conducted behind the scenes to make this possible.

It took a great deal of accuracy from the production team to ensure the steel element fitted together perfectly and the bricks of the two separate arches aligned perfectly when the two came together.

Why did you enjoy working on this project?

I enjoyed working on this project because the challenge of creating something unprecedented was exciting. The building itself was a beautiful design and you could visualise the arches.

There was a real sense of achievement when the finished product was installed perfectly as we had intended.

Visit the IG Masonry Support website

View the IGMS Signature Projects brochure

View the IGMS product brochure

Leave a Reply

Latest news

Vent-Axia

Vent-Axia welcomes editorial published in BMJ on ventilation reducing COVID-transmission

With further easing of lockdown restrictions on 17 May, pubs, restaurants, gyms, offices and other businesses should prepare for reopening by checking and improving their ventilation, says Vent-Axia.

Posted in Air Conditioning, Articles, Building Industry News, Building Services, Facility Management & Building Services, Health & Safety, Heating, Ventilation and Air Conditioning - HVAC, Interiors, news, Posts, Research & Materials Testing

Barratt

500,000 homes later: Barratt revisits past seven decades of homebuying to mark major milestone

Leading national housebuilder Barratt Developments PLC is celebrating the completion of its 500,000th home, with the launch of a new digital tool which takes a nostalgic look back through the past 60 years.

Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Facility Management & Building Services, Information Technology, Innovations & New Products

Senior

Senior brings its aluminium solutions to the ‘Steel City’

Leading manufacturer Senior Architectural Systems has successfully delivered the full aluminium fenestration packages to two new contracts in Sheffield.

Posted in Aluminium Products, Articles, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Curtain Walling, Doors, Facades, Glazing, Restoration & Refurbishment, Retrofit & Renovation, Walls, Windows

Selectaglaze

Centre of excellence for special educational needs is improved with Selectaglaze secondary glazing

A new school and centre of excellence for special educational needs in Chester’s historic Abbey Square features Selectaglaze secondary glazing. This is part of the refurbishment of two Grade II* Listed Georgian buildings.

Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Building Systems, Case Studies, Glass, Glazing, Lighting, Posts, Restoration & Refurbishment, Retrofit & Renovation, Windows