Washroom Washroom

Three-sy does it for Washroom Washroom

  • 15 Nov 2017

Washroom Washroom has secured three new high profile contracts, with two due to start in a matter of weeks and the third in 2018.

The leading washroom designer and manufacturer will soon start work to deliver new washrooms for an office refurbishment project on Sheldon Square in Paddington.

The new male and female washrooms, which will feature the same design on all 11 floors of the building, will have Washroom’s highly engineered Marcato toilet cubicles, solid grade laminate duct panel systems and Corian trough-style vanity units. 

Also involved is the design and manufacture of unique Corian planters for all the male toilet areas; these bespoke planters, which showcase the versatility of Corian, will be filled with real plants to compliment the contemporary style created for the new washrooms.

Coming soon as well is the commencement of work at an office building on Victoria Embankment, close to Blackfriars Bridge in London.

The basement areas are now being upgraded to the same specification as the company’s previous install in the building four years ago.

The new washrooms will feature concealed consumable units, with paper towel and hand soap dispensers inset within the mirrors.

Bronze acid etched glass surrounds will also feature, along with full height Alto laminate toilet cubicles.

Completing this esteemed trio of projects is a contract at the new UK corporate headquarters of a global research-based biopharmaceutical company in Cambridge.

This will involve the team designing, manufacturing and installing its Sempre toilet cubicles in the washrooms on five levels; mezzanine, basement, ground floor, first floor and second floor.

On top of this, Washroom will be creating staff shower and changing facilities in the basement, featuring its Marcato shower cubicles, as well as bespoke lockers and benching.

Work is set to start on site in January 2018. More Washroom Washroom information can be found on 0800 999 8888 or email [email protected]

 

Contact:

Washroom Washroom Ltd.
Units 1-10 Hill Farm
Epping Lane
Abridge
Essex RM4 1TU

Phone: 0800 999 8888

Email: [email protected]

Visit the Washroom Washroom website

Leave a Reply

Latest news

Here’s how your hospital keys could be working harder

Hospital buildings require privacy and safety for patients, but must still remain a welcoming place. With ASSA ABLOY’s CLIQ® technology, you can achieve both.

Posted in Access Control & Door Entry Systems, Articles, Building Industry News, Building Products & Structures, Health & Safety, Posts, Security and Fire Protection

Stannah powers access in London Bridge Station rebuild

Stannah Major Projects has installed 11 lifts as part of the Access for All requirement in the rebuild of London Bridge Station.

Posted in Accessibility, Articles, Building Industry News, Building Products & Structures, Lifts, Posts

Registration opens for Futurebuild 2020

Registration has opened for Futurebuild 2020 with a call to industry to act now if we are to successfully tackle the challenges facing us all.

Posted in Articles, Building Industry Events, Building Industry News, Continuing Professional Development (CPD's), Exhibitions and Conferences, news, Posts, Sustainability & Energy Efficiency