Contour Heating

Why it’s essential to have prefabricated cut-outs for hospital radiators – Contour

  • 8 Mar 2021

With hectic environments and hard-working doctors and nurses, it is important that the installation process within hospitals is quick and easy, to cause as minimal disruption as possible, explains Contour

Prefabricated cut-outs can speed the installation time, reduce the amount of mess that is normally generated, whilst also lowering levels of disruption in busy hospital environments. 

What is a Prefabricated Cut-out For LST Radiator Covers?

A prefabricated cut-out LST radiator will mean the structure the guard is assembled with a variety of components at the manufacturing stage. 

This means the LST radiator has cut-outs that are premade before its transported to the designated site, in this case within hospitals. This cut-out will save time, eliminate wastage, and reduce on-site noise.

Prefabricated radiator guards can effectively be dismantled and migrated to various destinations, which essentially lessens the demand for raw materials, limits expended energy and diminishes time. 

With this in mind, what are the benefits of using a prefabricated cut-out for LST radiators within hospitals?

Reduced Hospital Disruption

A prefabricated cut-out minimises the noise and mess made when installing. With equipment and material supplies lying around the hospital during installation, it can become hazardous for service users. 

This limits the disruption of hospital service users that mind noise, waste, and other common irritants. 

This streamlined approach provides a far more efficient atmosphere for productivity and eliminates unnecessary distractions and interference that are typical for radiator installation.

Shorter Installation Time

Prefabricated cut-outs have been found to take less than half the time, in comparison to traditional radiator cover installation.

This is due to the time Contour take on site to measure for the covers. Going into extra detail at the survey stage provides a better finish and overall design. 

The shorter time is beneficial for hospital environments, as installers can quickly get the job done to cause less disruption to the hospital environment.

Safer Installation 

Since prefabricated cut-outs are already constructed before getting to the hospital environment, there’s less risk for problems with an injury that may occur when doing the cut-outs under the busy pressure hospitals may offload.

Great To Use In Wet Environments

Prefabricated cut-outs are great to use in wet environments and for vinyl flooring, because in wet rooms there are coated edges, and anything exposed in the wet room could compromise the powder coating.

A radiator that is installed in hospital bathrooms can have a high chance of coming into contact with water from steam that may be generated from showers and taps. If metal is not properly protected, rust can appear.

Therefore, for wet environments, prefabricated cut-outs can be supplied with magnelis steel. This steel will have had additional treatment to make it more durable and suitable for wet environments, prolonging the lifetime of the radiator.

Conclusion

Prefabricated cut-outs for hospital environments with vinyl flooring, skirting boards and pipework ensures there is no need for a noisy and messy installation process. This will ultimately reduce disruption, debris and the installation time for hospital environments.

Contour can be contacted at;
The Mansions
43 Broadway
Shifnal
TF11 8BB
Tel: 01952 290 498
Email: [email protected]

Visit the website

Twitter

Facebook

LinkedIn

Leave a Reply

Latest news

Encasement

Encasement Verta column casings - covering up with style

The demands of architects and specifiers seeking to create stylish finishes on a diverse range of building interior and exterior projects are the main drivers behind the versatility and extensive choice available within the Encasement Verta column casing range.

Posted in Articles, Building Industry News, Building Products & Structures, Canopies, Entrances & Column Casings, Case Studies, Interior Design & Construction, Interiors, Restoration & Refurbishment, Retrofit & Renovation, Walls

Pyroguard

Pyroguard launches on-demand CPD webinar

Pyroguard has launched an on-demand version of its RIBA-approved CPD seminar – ‘Fire safety glazing: a system, not a product’  – in a bid to guide the industry regarding the critical role of fire safety glass.

Posted in Articles, Building Industry Events, Building Industry News, Building Products & Structures, Building Services, Continuing Professional Development (CPD's), Glass, Glazing, Health & Safety, Information Technology, Innovations & New Products, Posts, Retrofit & Renovation, Seminars, Training, Windows

West Fraser

Reduce sound transference with West Fraser CaberAcoustic

CaberAcoustic from West Fraser is a highly versatile, effective and economical sound-reducing flooring solution. Reducing both impact and airborne transmitted sounds, it can be laid over concrete and timber floors in both new and existing buildings.

Posted in Acoustics, Noise & Vibration Control, Articles, Building Industry News, Building Products & Structures, Building Services, Building Systems, Facility Management & Building Services, Floors, Interior Design & Construction, Interiors, Posts, Restoration & Refurbishment, Retrofit & Renovation, Timber Buildings and Timber Products

Vent-Axia

Vent-Axia Kicks Off Charity Football Tournament in Support of Cancer Research UK

Ventilation leader Vent-Axia brought together leading building design professionals for an action-packed Charity Powerleague 5-a-side Football Tournament on Thursday 20th March in Shoreditch, London, in aid of Cancer Research UK.

Posted in Air Conditioning, Articles, Building Industry Events, Building Industry News, Building Products & Structures, Building Services, Charity work, Facility Management & Building Services, Heating, Ventilation and Air Conditioning - HVAC