Washroom Washroom

Washroom Washroom goes to great lengths for office refurb

  • 31 Jul 2017

  • Share

Washroom Washroom has recently been working on a major office refurb project.

The washroom designer and manufacturer created a full scale mock-up washroom at its Essex factory before the planned on-site installation.

Washroom worked closely with the client and architectural team to agree the final design.

The mock-up was carefully considered and included all elements of the design, from top vanities and iPad holders to toilet cubicle doors. To achieve a more accurate picture, Washroom took a photo of the existing toilet window and blew it up and included it in the washroom set.

As a result, the client was able to view the washroom as close to complete as possible.

Washroom manufactured all of the products for the project and stored them ready to be delivered to site in time for installation.

Contact:

Washroom Washroom Ltd.
Units 1-10 Hill Farm
Epping Lane
Abridge
Essex RM4 1TU

Phone: 0800 999 8888

Email: info@washroom.co.uk

Visit the Washroom Washroom website

Leave a Reply

More articles

Bull Products

Minimise injury by avoiding common health and safety mistakes: Bull

Bull Products have shared the most common health and safety mistakes made by the construction industry, and more importantly, how they can be avoided.

Posted in Articles, Building Industry News, Health & Safety, Posts, Research & Materials Testing, Security and Fire Protection, Site Preparation

  • Share
Keylite

User experience important with new Keylite Specification Tool

Keylite has launched a brand new Specification Tool, with new product ranges included, technical information improved and a more enhanced user experience at its core.

Posted in Articles, Building Industry News, Building Products & Structures, Information Technology, Innovations & New Products, Posts, Research & Materials Testing, Roofs, Windows

  • Share
Closomat

Changing places for invisible disability with Closomat

Up to 6million people in the UK are affected by continence issues, according to latest figures from the NHS – Closomat have stressed the importance of the Changing Places toilet.

Posted in Accessibility, Articles, Bathrooms, Bedrooms & Washrooms, Building Industry News, Health & Safety, Interiors, Posts

  • Share
Aggregate Industries

Aggregate turns down the volume at A14 Brampton Hut services

Aggregate Industries’ contracting division has recently laid 1,800 tonnes of an ultra-low noise asphalt at Brampton Hut Services in Huntingdon, in just one weekend.

Posted in Articles, Building Industry News, Building Products & Structures, Case Studies, Civil Engineering, Concrete, Cement, Admixtures, Hard Landscaping & Walkways, Landscaping, Posts, Restoration & Refurbishment, Retrofit & Renovation

  • Share