Recognising the benefits of offsite construction methods, Clearview Homes chose to approach IG Masonry Support to design a practical solution for achieving six large brick slip apex lintels for an exclusive West London development.

Oak Grove is situated in the urban district of Acton – the five contemporary properties exhibit impressive architectural features, demonstrating Clearview Homes’ attention to detail when it comes to brick elements.

Designed and built to an exceptional standard, it is truly an impeccable collaboration of both on-site and off-site building techniques.

The Challenge

Clearview Homes’ Oak Grove development sought six large prefabricated brick slip apex lintels on the Shaa Road development.

The apex was a crucial element of the design, as it guaranteed the development was in keeping with the existing gable-front properties on the street.

IG designed an off-site solution to span the 3269mm opening, carefully considering the installation process to minimise the time period contractors were working at heights.

IG received a consignment of the Wienerberger Downton Red brick type, so that the off-site installation blended seamlessly with brickwork constructed on-site.

At 515mm, the lintel section’s height equates to seven courses of brick bonded in a stretcher-bond pattern – the lintel also required a three course deep brick soffit to accommodate the recessed opening below and to make sure no structural steel was visible once built-in.

IG Lintels

The Solution

The prefabricated brick slip apex lintels were delivered to site and simply lifted into position using a crane. The end bearing plates of the apex were built into the brickwork below, ensuring the installation was level and suitably bedded into mortar.

Tapered brickwork was then built above the end bearing to fill the wedged section and facilitate a smooth transition into the apex. The mortar joints between brick slips were then pointed to allow for the seamless integration of the prefabricated component.

A stone coping provided the perfect finishing touch to the apex arches. Mechanical fixings were required in order to secure the stone to the sloped steel lintel.

IG designed a number of small angles to be tech screwed into the backing steel of the brick slip lintel, securing the coping via a dowel restraint into the stone.

The effective combination of onsite and offsite building techniques demonstrates the benefits of modern building methods, streamlining the process and enabling swift assembly on site. 

Visit the IG Lintels website

Download Hi-therm+ Brochure

Download IG Brick Slip Feature Lintels Brochure

Leave a Reply

Latest news

Mitsubishi Electric

Mitsubishi Electric set to host CIBSE Journal webinar

Mitsubishi Electric will host a CIBSE Journal webinar on Wednesday 24th April 2024 at 1pm to discuss the legislation and initiatives driving changes in the way we will need to heat, cool and ventilate large commercial buildings to reach net zero emissions in the UK.

Posted in Air Conditioning, Articles, Building Industry Events, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Facility Management & Building Services, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Information Technology, Pipes & Fittings, Plumbing, Seminars, Sustainability & Energy Efficiency, Training

Hamworthy

Hamworthy: What to consider when choosing a heat pump?

At the heart of an efficient heat pump system lies an important element: the refrigerant – Jason Allen, Commercial Product Manager, Groupe Atlantic UK, ROI & NA. Hamworthy Heating is a Groupe Atlantic brand.

Posted in Articles, Building Industry News, Building Products & Structures, Building Services, Facility Management & Building Services, Heating Systems, Controls and Management, Heating, Ventilation and Air Conditioning - HVAC, Pipes & Fittings, Plumbing, Retrofit & Renovation, Sustainability & Energy Efficiency

Kingspan

EJOT Colorfast chosen for Kingspan’s highly sustainable new Asian factory

More than 120,000 EJOT Colorfast self-drilling fasteners have helped Kingspan to create a thermally superior, visually-appealing building envelope for its first purpose-built manufacturing plant in South East Asia.

Posted in Articles, Building Industry News, Building Products & Structures, Building Systems, Case Studies, Posts, Restoration & Refurbishment, Retrofit & Renovation, Roofs, Sustainability & Energy Efficiency

ASSA ABLOY

ASSA ABLOY helps new manufacturing plant achieve LEED Gold certification

Improving sustainability performance is becoming a higher priority for building developers, owners and users. One consequence is fast-growing demand for green building certifications — and therefore specification. Specialist input can make the difference between hitting and missing a project target, as ASSA ABLOY explains here…

Posted in Access Control & Door Entry Systems, Architectural Ironmongery, Articles, BIM, Infrastructure & CAD Software, Building Industry News, Building Products & Structures, Building Regulations & Accreditations, Building Services, Case Studies, Doors, Facility Management & Building Services, Information Technology, Retrofit & Renovation, Security and Fire Protection, Sustainability & Energy Efficiency